Environmental Studies
Documents:
Phase: II JPA Public Notice
- Public Notice Letter
- Cover Letters and JPA Form
- Vicinity Maps
- Impact Summary Charts
- Wetland Impact Plates
- Avoidance and Minimization Memorandum
- Compensatory Mitigation Plan
- Appendix C – HT-3012
- Appendix D - Carsin Run
- Appendix D.1 - Carsin Run MDE Comments 20240521
- Appendix D.2 - Carsin Run As-Built Design Plans - Conformed - Part 1
- Appendix D.2 - Carsin Run As-Built Design Plans - Conformed - Part 2
- Appendix D.2 - Carsin Run As-Built Design Plans - Conformed - Part 3
- Appendix D.2 - Carsin Run As-Built Design Plans - Conformed - Part 4
- Appendix D.3 - Carsin Run Design Report Rev 2021.05.25 - Part 1
- Appendix D.3 - Carsin Run Design Report Rev 2021.05.25 - Part 2
- Appendix E - Eccleston
- Appendix E.1 - Eccleston Credit Ledger
- Appendix E.2 - Eccleston Mitigation Site - 100% Design Report - Part 1
- Appendix E.2 - Eccleston Mitigation Site - 100% Design Report - Part 2
- Appendix E.2 - Eccleston Mitigation Site - 100% Design Report - Part 3
- Appendix E.2.M-C - LTM Cost Estimate
- Appendix E.3 - Eccleston Revisions to Monitoring Plan
- Appendix E.4 - Eccleston Mitigation Site - 100% Plan Set_Part-1
- Appendix E.4 - Eccleston Mitigation Site - 100% Plan Set_Part-2
- Appendix E.4 - Eccleston Mitigation Site - 100% Plan Set_Part-3
- Appendix E.4 - Eccleston Mitigation Site - 100% Plan Set_Part-4
- Appendix E.5 - Eccleston Title Exceptions Explanation
- Appendix F TIP
- Agency Coordination
- Adjacent Property Owner Information
- 08a – Roadway Adjacent Property Owner Maps and Table
- 08b – Eccleston Adjacent Property Owner Maps and Table
- 08c – Example Letters
- 08d – Roadway Adjacent Property Owner Mailing Labels
- 08e – Eccleston Adjacent Property Owner Mailing Labels
- 08f – Public Official Mailing Labels
- 08g – Certification of Notification
- 08h – Public Notice Billing Approval
- Additional Information
Phase: I 2020 Permit Modification Materials
Phase: I 2018 Joint Permit Application Materials
- Notice of Public Informational Hearing
![]()
- Public Meeting Boards
![]()
- US Army Corps of Engineers Public Notice 06-18-2018
![]()
- MDE Public Notice 06-15-2018
![]()
- Impact Plates
![]()
- Proposed Mitigation Sites
![]()
- Mitigation Site Maps
![]()
- Vicinity Maps
![]()
Additional Information
I-95 ETL Northbound – Environmental Studies Archive
Phase II JPA Public Notice
- Public Notice Letter (PDF Download)
- Cover Letters and JPA Form
- 01a – September 2024 Response to Comments Letter (PDF Download)
- 01b – June 2024 Cover Letter (PDF Download)
- 01c – Joint Permit Application (PDF Download)
- Vicinity Maps
- 02a – Roadway Vicinity Map (PDF Download)
- 02b – Eccleston Vicinity Map (PDF Download)
- Impact Summary Charts
- 03a - Impact Table (PDF Download)
- 03b - Table of Impact Changes (PDF Download)
- Wetland Impact Plates
- 04a – KH-3019 Impact Plates (PDF Download)
- 04b – KH-3020 Impact Plates (PDF Download)
- 04c – KH-3022 As-Built Impact Plates (PDF Download)
- 04d – KH-3023 As-Built Impact Plates (PDF Download)
- 04e – KH-3031 Impact Plates (PDF Download)
- 04f – KH-3038 As-Built Impact Plates (PDF Download)
- 04g – KH-3043 As-Built Impact Plates (PDF Download)
- Avoidance and Minimization Memorandum
- Compensatory Mitigation Plan
- Compensatory Mitigation Plan report (PDF Download)
- Appendix A - Figures (PDF Download)
- Appendix B - Impacted Resource Tables (PDF Download)
- Appendix C – HT-3012
- Appendix C.1 - HT-3012 Final Report - Part 1 (PDF Download)
- Appendix C.1 - HT-3012 Final Report - Part 2 (PDF Download)
- Appendix C.2 - HT-3012 Plans (PDF Download)
- Appendix D - Carsin Run
- Appendix D.1 - Carsin Run MDE Comments 20240521 (PDF Download)
- Appendix D.2 - Carsin Run As-Built Design Plans - Conformed - Part 1 (PDF Download)
- Appendix D.2 - Carsin Run As-Built Design Plans - Conformed - Part 2 (PDF Download)
- Appendix D.2 - Carsin Run As-Built Design Plans - Conformed - Part 3 (PDF Download)
- Appendix D.2 - Carsin Run As-Built Design Plans - Conformed - Part 4 (PDF Download)
- Appendix D.3 - Carsin Run Design Report Rev 2021.05.25 - Part 1 (PDF Download)
- Appendix D.3 - Carsin Run Design Report Rev 2021.05.25 - Part 2 (PDF Download)
- Appendix E - Eccleston
- Appendix E.1 - Eccleston Credit Ledger (PDF Download)
- Appendix E.2 - Eccleston Mitigation Site - 100% Design Report - Part 1 (PDF Download)
- Appendix E.2 - Eccleston Mitigation Site - 100% Design Report - Part 2 (PDF Download)
- Appendix E.2 - Eccleston Mitigation Site - 100% Design Report - Part 3 (PDF Download)
- Appendix E.2.M-C - LTM Cost Estimate (PDF Download)
- Appendix E.3 - Eccleston Revisions to Monitoring Plan (PDF Download)
- Appendix E.4 - Eccleston Mitigation Site - 100% Plan Set_Part-1 (PDF Download)
- Appendix E.4 - Eccleston Mitigation Site - 100% Plan Set_Part-2 (PDF Download)
- Appendix E.4 - Eccleston Mitigation Site - 100% Plan Set_Part-3 (PDF Download)
- Appendix E.4 - Eccleston Mitigation Site - 100% Plan Set_Part-4 (PDF Download)
- Appendix E.5 - Eccleston Title Exceptions Explanation (PDF Download)
- Appendix F TIP (PDF Download)
- Agency Coordination
- 07a – Agency Coordination Table (PDF Download)
- 07b1 – NMFS Coordination (PDF Download)
- 07b2 – NMFS Coordination (PDF Download)
- 07c – Supplemental EFH Form (PDF Download)
- 07d – USFWS Species List (PDF Download)
- 07e – Northern Long Eared Bat Consistency Letter (PDF Download)
- 07f – Section 200 Bat Coordination (PDF Download)
- Adjacent Property Owner Information
- 08a – Roadway Adjacent Property Owner Maps and Table (PDF Download)
- 08b – Eccleston Adjacent Property Owner Maps and Table (PDF Download)
- 08c – Example Letters (PDF Download)
- 08d – Roadway Adjacent Property Owner Mailing Labels (PDF Download)
- 08e – Eccleston Adjacent Property Owner Mailing Labels (PDF Download)
- 08f – Public Official Mailing Labels (PDF Download)
- 08g – Certification of Notification (PDF Download)
- 08h – Public Notice Billing Approval (PDF Download)
- Additional Information
- 09a – KH-3043 Delineated Resource Maps (PDF Download)
- 09b – Tier II Social and Economic Justification Approval (PDF Download)
Phase I 2018 Joint Permit Application Materials
- Notice of Public Informational Hearing (PDF Download)
- Public Meeting Boards
- US Army Corps of Engineers Public Notice 06-18-2018 (PDF Download)
- MDE Public Notice 06-15-2018 (PDF Download)
- Impact Plates (PDF Download)
- Proposed Mitigation Sites (PDF Download)
- Mitigation Site Maps (PDF Download)
- Vicinity Maps (PDF Download)
Maryland Transportation Authority
Attn: Nafiz Alqasem, PE
Deputy Director of Project Development
Office of Engineering and Construction
8019 Corporate Drive, Suite F
Nottingham, MD 21236
[email protected]
Comments can be submitted by either U.S. mail or email to the above addresses.
All documents are provided in Adobe PDF format. If you do not have a PDF viewer you can download a free version of Adobe Acrobat Reader at http://get.adobe.com/reader.