Skip to main content
MDTA Home

Q: Why was the old bridge being replaced?

A: Completed in 1940, the old bridge suffered from traffic congestion and did not meet current safety standards. The old crossing would have required increasing maintenance and, due to the bridge’s single-lane capacity in each direction and lack of nearby alternative crossings, rehabilitation work would have caused severe traffic impacts.

Q: How does the new bridge compare with the old bridge?

A: The new bridge improves mobility, safety, and economic opportunities for Southern Maryland, Northeastern Virginia, and the region. Here are key comparisons:

  

NEW BRIDGE OLD BRIDGE
Four 12-foot-wide lanes Two 11-foot-wide lanes
Barrier-separated median        No Median
Two-foot-wide shoulders No shoulders
All tolls paid at highway speeds Cash tolls paid when stopped; some E-ZPass tolls paid at reduced-speed lanes
100-year service life Increasing maintenance needs and costs

Q: When did the new bridge open to the public?

A: The new bridge opened to the public on October 12, 2022

Q: What is happening to the old bridge?

A: Now that the new bridge is open, the old bridge is being demolished, and Some materials are being deposited in the Chesapeake Bay to aid in fish reef enhancements.

Q: How much does it cost to cross the new bridge?

A: The regular toll for passenger vehicles is currently $4.50. A commuter discount rate plan is available. For more information and to determine toll rates for other vehicles, please visit MDTA’s toll rate webpage.

Q: Do I need an E-ZPass to cross the new bridge?

A: The new bridge enables travelers to pay tolls at highway speeds by using an E-ZPass Maryland transponder or by Video Tolling. Drivers are strongly encouraged to acquire an E-ZPass due to significantly lower toll rates: Read more about E-ZPass, including how to get a transponder, here.

Project Study

 

Get Abobe Acrobat Reader

The meeting agendas and minutes are provided in Adobe PDF format. If you do not have a PDF viewer you can download a free version of Adobe Acrobat Reader at http://get.adobe.com/reader.

WAS THIS PAGE HELPFUL?

Public Calendar

Nov 21

MDTA Board Meeting - November 21, 2024

9 AM

Livestream

This public meeting is livestreamed and archived on the MDTA Board Meeting Homepage. The MDTA Board Meeting homepage also provides access to the meeting schedule, materials, agenda and minutes.

Dec 03

Capital Committee Meeting - December 3, 2024

9 AM

Livestream

This public meeting is livestreamed and archived on the Capital Committee Meeting Homepage. The Capital Committee Meeting homepage also provides access to the virtual meeting, schedule, agenda, materials and minutes.

Dec 04

CHESAPEAKE BAY CROSSING STUDY TIER 2 NEPA OPEN HOUSES

6 PM

Virtual Open House

Chesapeake Bay Crossing Study Tier 2 NEPA - Open Houses Dec.4, 9, and 11

On December 4, 9, and 11, 2024, the Maryland Transportation Authority (MDTA) will host Open Houses for the Chesapeake Bay Crossing Study: Tier 2 NEPA (Tier 2 Study). 

Virtual Open House
Wednesday, December 4, 2024
(6-8 p.m.)

Follow link to learn more: baycrossingstudy.com

 
E-ZPass logo

E-ZPASS®

Save time with an E-ZPass.

Stop Fraud - Follow link.

Follow link to report fraud and/or abuse of State resources.