The MDTA Board approved The Six-M Company Inc. for the construction services contract. The contract involves construction of a structurally supported concrete slab to replace a section of pavement and prevent future settlement of the roadway near the MD 157 (Peninsula Expressway) underpass; repair of backwalls, approaches, and miscellaneous superstructure repairs at six bridges crossing Bear Creek, MD 157 and the Tradepoint Atlantic Railroad; pavement patching; traffic barrier replacement; and drainage repairs.
Expected to begin major construction early in 2024, this system preservation project is necessary to address settlement of I-695 that has occurred since it was widened to a multi-lane, median-divided highway in the 1990s. Additional work also will be completed to rehabilitate and enhance the safety of I-695 in this area. Construction is expected to be complete in summer/fall 2025.
The project spans nearly three miles along the Baltimore Beltway, from the Broening Highway interchange (Exit 44) to just west of the MD 151 North Point Boulevard interchange (Exit 42). Throughout construction, I-695 will remain open with at least one lane of traffic in each direction maintained at all times.
The MDTA had designed the project in phases, with simultaneous work scheduled to occur to help minimize the impact to our motorists and local communities and businesses. However, the collapse of the FSK Bridge has significantly affected anticipated traffic volumes on I-695 within the project limits. Subsequently, the MDTA will continuously re-evaluate the lane closures and detours previously planned and will provide additional details as they become available.
Follow link to enlarge map
Beginning around the week of May 6, pile driving will occur on I-695 just east of the MD 157 (Peninsula Expressway) Overpass Bridge.
- We are doing our best to limit disruptions to the community.
- Loud noise and possible vibrations will be felt in the surrounding area.
- Work will take place during the daytime hours.
- PHASE 1 - Spring 2024
- PHASE 2 - Spring 2024 through Winter 2024/2025
- PHASE 3 - Winter 2024/2025 through Fall 2025
- PHASE 4 & 5 - Fall 2025 through Winter 2025/2026
- Driver Update 10-30-2024 (PDF Download)
- Driver Update 07-18-2024 (PDF Download)
- Noise Alert Flyer 05-24-2024 (PDF Download)
- Driver Update 05-24-2024 (PDF Download)
- Driver Update 04-12-2024 (PDF Download)
- I-695 at Sparrows Point near Bear Creek Contact Card (PDF Download)
- I-695 at Sparrows Point near Bear Creek Contact Card - Spanish (PDF Download)
- I-695 at Sparrows Point near Bear Creek Comment Form (PDF Download)
- I-695 at Sparrows Point near Bear Creek Comment Form - Spanish (PDF Download)
- I-695 at Sparrows Point near Bear Creek Informational Open House 11-09 and 11-15 Boards (PDF Download)
- I-695 at Sparrows Point near Bear Creek Informational Open House 11-9 and 11-15 Boards - Spanish (PDF Download)
- I-695 Repairs and Rehabilitation at Sparrows Point near Bear Creek News Release 10-26-2023
I-695 @ Peninsula
I-695 @ MD-151
Crews will be performing essential roadwork as part of the Maryland Transportation Authority’s (MDTA) I-695 at Sparrows Point near Bear Creek project to address and prevent future settlement of I-695 and to enhance the safety of I-695 in this area.