Skip to main content
Home

STAY INFORMED

Sign up for updates and alerts from the Maryland Transportation Authority.

 

All-Electronic (Cashless) Tolling / AET

Fort McHenry Tunnel I-95 All Electronic (Cashless) Tolling

The Maryland Transportation Authority (MDTA) began all-electronic tolling (AET) construction work in Fall 2021 at the Fort McHenry Tunnel (I-95) toll plaza. The project will implement permanent highway-speed AET at the Fort McHenry Tunnel toll plaza. With cashless toll collection, there’s no slowing or stopping to pay tolls. Instead, motorists pay tolls at highway speed via E-ZPass, Pay-By-Plate or Video Tolling. Benefits include increased safety, less engine idling and better fuel efficiency.

The FMT project will convert the toll plaza area into highway-speed lanes by removing toll booths and canopy and will be completed in stages.

FMT I-95 All Electronic (Cashless) Tolling – Construction

Winter 2021 – Summer 2022

  • Toll lanes 6-8 Northbound are closed.
  • Toll lanes 16-19 Southbound are closed.
  • Removal of toll booths, islands and canopy in toll plaza lanes 6-8 Northbound and 16-19 Southbound.
  • Construction of tolling gantry and ITS/Electrical equipment installation.
  • Installation and testing of tolling equipment.

Summer 2022 – Fall 2023

  • Activation of overhead tolling gantry, and highway-speed cashless tolling begins through former toll plaza lanes 6-8 Northbound and 16-19 Southbound.
  • Removal of toll booths, islands, and canopy in lanes 1-5 and 9-11 Northbound, and lanes 14-15 and 20-24 Southbound.
  • Milling and final pavement overlay.

NORTHBOUND I-95

Fort McHenry Tunnel Driver’s Update

Starting March 28, weather permitting, four highway speed lanes through the former toll plaza will be open for motorists traveling I-95 northbound at the Fort McHenry Tunnel.

  • All motorists must obey the posted speed limits for the lane of travel.
  • Commercial vehicles and motorists using Exit 56/Keith Avenue should stay right.
  • Tolling remains in effect.
  • Always properly mount your E-ZPass transponder and keep your account up to date to receive the lowest toll rate.
  • Northbound tolls will be collected via new overhead electronic toll gantry just after the tunnel bore. 
  • With gantry activation, toll feedback displays in former plaza are deactivated.
  • Stay alert and adhere to overhead lane-use signals.

Fort McHenry Tunnel Toll Plaza That Was Then

FMT AET Toll Plaza Demolition

Fort McHenry Tunnel I-95 AET Configuration at Former Toll Plaza Site

Rendering of FMT plaza.

Fort McHenry Tunnel AET Gantry Along I-95 Northbound and Southbound

Fort McHenry Tunnel AET Gantry Along I-95 Northbound and Southbound

Gantries rendering

WAS THIS PAGE HELPFUL?

Public Calendar

Oct 20

Bay Bridge Protection Project Industry Forum

10 AM

Harry Hughes Conference Room
MDOT Headquarters
7201 Corporate Center Drive
Hanover, MD 21076

 

Marine Contractors, Engineers, and MBE Firms! Are you interested in working on the Bay Bridge Protection Project?

Join us for the MDTA Industry Forum on Monday, October 20, 2025 from 10:00 AM to 12:00 PM. 

Bay Bridge Protection Project Industry Forum - October 2025

Oct 20

11th Annual Community Health & Resource Info Fair at Turner Station

6 PM

Sollers Point Multipurpose Center
323 Sollers Point Road, Baltimore, MD 21222

DriveEzMD Outreach will be at the upcoming Community Health Fair! Stop by our booth to get your E-ZPass questions answered and learn more about how we can help keep you moving.

 

6:00pm – 8:00pm

Oct 25

MDTA Police Trunk or Treat Fall Festival

10 AM

FOP Lodge #34
730 Wampler Road, Middle River, MD 21220

Come out and join DriveEzMD Outreach at the MDTA Police Trunk or Treat Fall Festival! Stop by our booth to get your E-ZPass questions answered while enjoying food trucks, kids’ activities, holiday shopping from local vendors and Trunk or Treat fun!

10:00am – 3:00pm