Skip to main content
Home

STAY INFORMED

Sign up for updates and alerts from the Maryland Transportation Authority.

 

Capital Program

Consolidated Transportation Program

Each year the Maryland Transportation Authority (MDTA) releases its portion of the Maryland Department of Transportation's Consolidated Transportation Program (CTP) report. The MDTA portion of the CTP presents its ongoing and new capital projects for a six-year period (the current year, the upcoming budget year and the four succeeding planning years) for its facilities. It also describes how the MDTA will fund these programs to achieve its goals. The Draft CTP report is presented to local elected officials and citizens in September through November throughout Maryland for review and comments. It is then revised and submitted as a Final CTP report as part of the Governor's budget to the Maryland General Assembly in January.

The CTP is separated into three parts:

  1. Construction Program Major Projects,
  2. Development and Evaluation (D&E) Program Major Projects, and
  3. System Preservation Minor Projects.

Major Capital projects are listed individually; Minor projects (i.e., safety, rehabilitation) are grouped and shown by facility.

The Construction and System Preservation Minor Projects programs include those projects which are scheduled to begin construction within the six-year period.  Project work phases included in the CTP are:

  1. Planning,
  2. Design & Engineering,
  3. Right-of-way Acquisition, and
  4. Construction.

The D&E Program contains those major projects, that are being prepared for possible future addition to the Construction Program. Projects are added to the Construction program as funds become available and as design is advanced significantly, based on the merits of the projects, and as workload allows. Work phases included in the D&E Program are Planning and Engineering and sometimes Right-of-way Acquisition.

The CTP process objectives:

  1. Identify revisions to the current Capital Program.
  2. Identify, select and prioritize new projects to be added to the Capital Program that meet the MDTA's goals and priorities. Projects selection criteria includes:
    • Convenience
      • Move people and goods conveniently.
      • Preserve and improve MDTA facilities.
    • Safety
      • Reduce the fatal and injury vehicle collision rate.
      • Reduce workplace accidents.
    • Security
      • Protect people and property from unlawful activity.
    • Economic Development
      • Finance and build new transportation facilities with the Maryland Department of Transportation to meet Maryland's transportation needs.
    • Service
      • Respond professionally to customers' needs for assistance and information.

Documents:

FY 2025-20230 Final Consolidated Transporation Program - Where are the Projects?  - FY 2025-2030 = $5.1 Billion

WAS THIS PAGE HELPFUL?

Public Calendar

Jul 05

DriveEzMD Team - Iron Birds (Kickoff to Maryland 250 Celebration)

7 PM

Ripken Stadium
873 Long Drive
Aberdeen, MD 2100

Our DriveEzMD Team is in your community! Come talk with us about everything tolling – E-ZPass, Pay-By-Plate & Video Tolling. Pick up an E-ZPass On the Go and save up to 77% on your toll trips.

Iron Birds VS Greensboro (Kickoff to Maryland 250 Celebration)

Jul 10

Finance and Administration Committee Meeting - July 10, 2025

9 AM

Livestream

This public meeting is livestreamed and archived on the Finance and Administration Committee Meeting Homepage. The Finance and Administration Committee Meeting homepage also provides access to the virtual meeting, schedule, agenda, materials and minutes.

Jul 11

DriveEzMD Team - Tyler the Creator at CFG Arena

6 PM

CFG Bank Arena
201 W Baltimore St.
Baltimore, MD 21201

Our DriveEzMD Team is in your community! Come talk with us about everything tolling – E-ZPass, Pay-By-Plate & Video Tolling. Pick up an E-ZPass On the Go and save up to 77% on your toll trips.