Skip to main content
MDTA Home
Stay Informed

Sign up for updates and alerts from the Maryland Transportation Authority

MDTA Traffic Advisories

The MDTA Traffic Advisories blog posts information about scheduled construction and maintenance projects or other traffic information that might interfere with the normal flow of traffic. Use the Keywords list to locate traffic advisories by facility.

24/7 TRAFFIC SHIFT ON SOUTHBOUND I-95 BETWEEN EASTERN AVENUE AND FORT MCHENRY TUNNEL

FOR IMMEDIATE RELEASE

Feb. 12, 2018

 

24/7 TRAFFIC SHIFT ON SOUTHBOUND I-95 BETWEEN EASTERN AVENUE AND FORT MCHENRY TUNNEL

 

WHAT: All lanes on southbound I-95 between Eastern Avenue and the Fort McHenry Tunnel will be fully shifted to the left. There will be no right shoulder and only a small left shoulder.

Tags

(I-895) Baltimore Harbor Tunnel Lane Closures for the Week of Feb. 11, 2018

For Immediate Release

Facility: (I-895) Baltimore Harbor Tunnel

During tunnel closures at the (I-895) Baltimore Harbor Tunnel, drivers may experience 15-20 minute delays while two-way operations (during which one lane of southbound and northbound traffic is directed into the tunnel that remains open) are implemented. Closure times are dependent on traffic volumes.

WORK TO RESULT IN TEMPORARY CLOSURES OF I-95 RAMPS IN BALTIMORE CITY

FOR IMMEDIATE RELEASE

Feb. 8, 2018

 

WORK TO RESULT IN TEMPORARY CLOSURES OF

I-95 RAMPS IN BALTIMORE CITY

WHAT: The ramp from southbound I-95 to southbound MD 295 (Exit 52) will be closed temporarily to traffic. The detour route will direct motorists to I-695 East (Outer Loop), to southbound MD 295 (Exit 7A).

Tags

(I-895) Baltimore Harbor Tunnel Lane Closures for the Week of Feb. 4, 2018

For Immediate Release

Facility: (I-895) Baltimore Harbor Tunnel

During tunnel closures at the (I-895) Baltimore Harbor Tunnel, drivers may experience 15-20 minute delays while two-way operations (during which one lane of southbound and northbound traffic is directed into the tunnel that remains open) are implemented. Closure times are dependent on traffic volumes.

WORK TO RESULT IN TEMPORARY CLOSURES OF I-95 RAMPS IN BALTIMORE CITY

FOR IMMEDIATE RELEASE

Jan. 30, 2018

 

WORK TO RESULT IN TEMPORARY CLOSURES OF

I-95 RAMPS IN BALTIMORE CITY

 

WHAT: The ramp from southbound I-95 to southbound MD 295 (Exit 52) will be closed temporarily to traffic. The detour route will direct motorists to I-695 East (Outer Loop), to southbound MD 295 (Exit 7A).

Tags

WORK TO RESULT IN TEMPORARY CLOSURE OF RAMP FROM SOUTHBOUND I-95 TO NORTHBOUND I-395 IN BALTIMORE CITY

FOR IMMEDIATE RELEASE

Jan. 25, 2018

 

WORK TO RESULT IN TEMPORARY CLOSURE OF RAMP FROM SOUTHBOUND I-95 TO NORTHBOUND I-395

IN BALTIMORE CITY

WHAT: The ramp from southbound I-95 to northbound I-395 (Exit 53) will be closed temporarily to traffic. The detour route will direct motorists to Caton Avenue (Exit 50), to northbound I-95, to northbound I-395 (Exit 53).

Tags

(I-895) Baltimore Harbor Tunnel Lane Closures for the Week of Jan. 28, 2018

For Immediate Release

Facility: (I-895) Baltimore Harbor Tunnel

During tunnel closures at the (I-895) Baltimore Harbor Tunnel, drivers may experience 15-20 minute delays while two-way operations (during which one lane of southbound and northbound traffic is directed into the tunnel that remains open) are implemented. Closure times are dependent on traffic volumes.

WORK TO RESULT IN TEMPORARY SOUTHBOUND I-895 LANE CLOSURE IN BALTIMORE CITY THIS SATURDAY

FOR IMMEDIATE RELEASE

Jan. 22, 2018

 

WORK TO RESULT IN TEMPORARY SOUTHBOUND I-895 LANE CLOSURE IN BALTIMORE CITY

THIS SATURDAY

 

WHAT: One lane on southbound I-895 at Potee Street (Exit 7), south of the Baltimore Harbor Tunnel toll plaza, will be closed temporarily to traffic.

(I-895) Baltimore Harbor Tunnel Lane Closures for the Week of Jan. 22, 2018

For Immediate Release

Facility: (I-895) Baltimore Harbor Tunnel

During tunnel closures at the (I-895) Baltimore Harbor Tunnel, drivers may experience 15-20 minute delays while two-way operations (during which one lane of southbound and northbound traffic is directed into the tunnel that remains open) are implemented. Closure times are dependent on traffic volumes.

WORK TO RESULT IN TEMPORARY CLOSURES OF I-95 RAMPS IN BALTIMORE CITY

FOR IMMEDIATE RELEASE

Jan. 17, 2018

 

WORK TO RESULT IN TEMPORARY CLOSURES OF

I-95 RAMPS IN BALTIMORE CITY

 

WHAT: The ramp from southbound I-95 to southbound MD 295 (Exit 52) will be closed temporarily to traffic. The detour route will direct motorists to I-695 East (Outer Loop), to southbound MD 295 (Exit 7A).

Tags

Blog Calendar

WAS THIS PAGE HELPFUL?

Public Calendar

Apr 25

MDTA Board Meeting - April 25, 2024

8 AM

Livestream Event

This public meeting is livestreamed and archived on the MDTA Board Meeting Homepage. The MDTA Board Meeting homepage also provides access to the meeting schedule, materials, agenda and minutes.

Apr 27

DriveEzMD Team - Orioles Game at Camden Yards

4 PM

Oriole Park at Camden Yards
333 W. Camden Street
Baltimore MD 21201

Brandon Hyde Bobble Head Day

4:05pm – 6:05pm

Our DriveEzMD Team is in your community! Come talk with us about everything tolling – E-ZPass, Pay-By-Plate & Video Tolling. Pick up an E-ZPass On the Go and save up to 77% on your toll trips.

EZPass Pig With O's Bird

May 02

Capital Committee Meeting - May 2, 2024

9 AM

Livestream

This public meeting is livestreamed and archived on the Capital Committee Meeting Homepage. The Capital Committee Meeting homepage also provides access to the virtual meeting, schedule, agenda, materials and minutes.