Skip to main content
MDTA Home
Stay Informed

Sign up for updates and alerts from the Maryland Transportation Authority

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of Sept. 29 – Oct. 5

Submitted by Tamory Winfield on

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of Sept. 29 – Oct. 5

 

All work will be performed weather permitting.  The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals.  Headlights are required at all times on the bridgeLane closures are subject to change and closure times are dependent on traffic volumes

 

TOLL DOLLARS AT WORK

 

Reminder:  The right lane on the westbound span will be closed 24/7 for roadwork starting Sept. 30.  Expect major delays in both directions.

 

The westbound span may be closed Sunday from midnight to 5 a.m. the following morning, Monday through Wednesday from 9 p.m. to 5 a.m. the following morning, Thursday from 10 p.m. to 5 a.m. the following morning and Saturday from 11 p.m. to 5 a.m. the following morning for preservation/maintenance work or routine annual inspections.  Two-way traffic will operate on the eastbound span during the full westbound span closures.

Monday through Thursday, one lane will be closed for approximately 15 minutes for contractor pick-up.

FOR 24/7 BAY BRIDGE TRAFFIC INFORMATION CALL 1-877-BAYSPAN (1-877-229-7726) or visit Baybridge.com.

Know Before You Go - For real-time updates on major incidents follow us on Twitter at twitter.com/TheMDTA.  Sign up for email/text alerts at mdta.maryland.gov.  Find us at facebook.com/TheMDTA.  Call 511 or visit MD511.org for statewide travel information.

Blog Category

Blog Calendar

WAS THIS PAGE HELPFUL?

Public Calendar

Nov 21

MDTA Board Meeting - November 21, 2024

9 AM

Livestream

This public meeting is livestreamed and archived on the MDTA Board Meeting Homepage. The MDTA Board Meeting homepage also provides access to the meeting schedule, materials, agenda and minutes.

Dec 03

Capital Committee Meeting - December 3, 2024

9 AM

Livestream

This public meeting is livestreamed and archived on the Capital Committee Meeting Homepage. The Capital Committee Meeting homepage also provides access to the virtual meeting, schedule, agenda, materials and minutes.

Dec 04

CHESAPEAKE BAY CROSSING STUDY TIER 2 NEPA OPEN HOUSES

6 PM

Virtual Open House

Chesapeake Bay Crossing Study Tier 2 NEPA - Open Houses Dec.4, 9, and 11

On December 4, 9, and 11, 2024, the Maryland Transportation Authority (MDTA) will host Open Houses for the Chesapeake Bay Crossing Study: Tier 2 NEPA (Tier 2 Study). 

Virtual Open House
Wednesday, December 4, 2024
(6-8 p.m.)

Follow link to learn more: baycrossingstudy.com

 
E-ZPass logo

E-ZPASS®

Save time with an E-ZPass.

Stop Fraud - Follow link.

Follow link to report fraud and/or abuse of State resources.