Stay Informed

Sign up for updates and alerts from the Maryland Transportation Authority

MDTA Traffic Advisories

The MDTA Traffic Advisories blog posts information about scheduled construction and maintenance projects or other traffic information that might interfere with the normal flow of traffic. Use the Keywords list to locate traffic advisories by facility.

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of Sept. 13 - 19, 2015

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of Sept. 13 - 19, 2015

 

All work will be performed weather permitting.  The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals.  Lane closures are subject to change and closure times are dependent on traffic volumes. 

WORK TO RESULT IN TEMPORARY OVERNIGHT CLOSURES OF RAMPS FROM SOUTHBOUND I-95 IN BALTIMORE CITY THIS WEEKEND INTO NEXT WEEK

FOR IMMEDIATE RELEASE

Sept. 11, 2015 BB

 

WORK TO RESULT IN TEMPORARY OVERNIGHT CLOSURES OF RAMPS FROM SOUTHBOUND I-95 IN BALTIMORE CITY THIS WEEKEND INTO NEXT WEEK

 

WORK TO RESULT IN TEMPORARY OVERNIGHT CLOSURES OF RAMPS FROM SOUTHBOUND I-95 IN BALTIMORE CITY THIS WEEK

FOR IMMEDIATE RELEASE

Sept. 8, 2015 BB

 

WORK TO RESULT IN TEMPORARY OVERNIGHT CLOSURES OF RAMPS FROM SOUTHBOUND I-95 IN BALTIMORE CITY THIS WEEK

 

WHAT: The ramp from southbound I-95 to northbound I-395 (Exit 53) will be closed temporarily to traffic.

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of Sept. 8 - 12, 2015

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of Sept. 8 - 12, 2015

 

All work will be performed weather permitting.  The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals.  Lane closures are subject to change and closure times are dependent on traffic volumes. 

(I-895) Baltimore Harbor Tunnel Lane Closures for the Week of Sept. 8, 2015

For Immediate Release

Facility: (I-895) Baltimore Harbor Tunnel

During tunnel closures at the (I-895) Baltimore Harbor Tunnel, drivers may experience 15-20 minute delays while two-way operations (during which one lane of southbound and northbound traffic is directed into the tunnel that remains open) are implemented. Closure times are dependent on traffic volumes.

CHANGING TRAFFIC PATTERNS ON SOUTHBOUND I-95 IN BALTIMORE TOMORROW

FOR IMMEDIATE RELEASE

Sept. 3, 2015

Contact:          John Sales

                        410-537-1017

CHANGING TRAFFIC PATTERNS ON SOUTHBOUND I-95 IN BALTIMORE TOMORROW

#i95bmore

 

WORK TO RESULT IN TEMPORARY OVERNIGHT CLOSURES OF RAMP FROM SOUTHBOUND I-95 TO CATON AVENUE IN BALTIMORE CITY THIS WEEK

FOR IMMEDIATE RELEASE

Sept. 2, 2015

 

WORK TO RESULT IN TEMPORARY OVERNIGHT CLOSURES OF RAMP FROM SOUTHBOUND I-95 TO CATON AVENUE IN BALTIMORE CITY THIS WEEK

 

WHAT: The ramp from southbound I-95 to Caton Avenue (Exit 50) will be closed temporarily to traffic.

The detour route will direct motorists to I-695 (Exit 49A), to Hollins Ferry Road (Exit 9), to northbound I-695, to northbound I-95, to Caton Avenue (Exit 50).

WORK TO RESULT IN WEEKEND RIGHT LANE CLOSURE OF OUTER LOOP I-695 IN SOUTHEAST BALTIMORE

FOR IMMEDIATE RELEASE

Aug. 28, 2015

 

WORK TO RESULT IN WEEKEND RIGHT LANE CLOSURE OF OUTER LOOP I-695 IN SOUTHEAST BALTIMORE

 

WHAT:    The right lane on the Outer Loop of I-695 will be continuously closed from the Curtis Creek Drawbridge to the Francis Scott Key Bridge.

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of Aug. 30 - Sept. 5, 2015

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of Aug. 30 - Sept. 5, 2015

 

All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Lane closures are subject to change and closure times are dependent on traffic volumes.

(I-895) Baltimore Harbor Tunnel Lane Closures for the Week of Aug. 31, 2015

For Immediate Release

Facility: (I-895) Baltimore Harbor Tunnel

During tunnel closures at the (I-895) Baltimore Harbor Tunnel, drivers may experience 15-20 minute delays while two-way operations (during which one lane of southbound and northbound traffic is directed into the tunnel that remains open) are implemented. Closure times are dependent on traffic volumes.

Pages

S M T W T F S
 
1
 
2
 
3
 
4
 
5
 
6
 
7
 
8
 
9
 
10
 
11
 
12
 
13
 
14
 
15
 
16
 
17
 
18
 
19
 
20
 
21
 
22
 
23
 
24
 
25
 
26
 
27
 
28
 
29
 
30
 
 
 
 
 

Click to Translate:

Translation Disclaimer