WORK TO RESULT IN TEMPORARY OVERNIGHT CLOSURE OF I-695 OUTER LOOP IN NORTHEAST BALTIMORE
FOR IMMEDIATE RELEASE
Aug. 23, 2016
WORK TO RESULT IN TEMPORARY OVERNIGHT CLOSURE OF I-695 OUTER LOOP IN NORTHEAST BALTIMORE
The MDTA Traffic Advisories blog posts information about scheduled construction and maintenance projects or other traffic information that might interfere with the normal flow of traffic. Use the Keywords list to locate traffic advisories by facility.
FOR IMMEDIATE RELEASE
Aug. 23, 2016
WORK TO RESULT IN TEMPORARY OVERNIGHT CLOSURE OF I-695 OUTER LOOP IN NORTHEAST BALTIMORE
Facility: (I-895) Baltimore Harbor Tunnel
During tunnel closures at the (I-895) Baltimore Harbor Tunnel, drivers may experience 15-20 minute delays while two-way operations (during which one lane of southbound and northbound traffic is directed into the tunnel that remains open) are implemented. Closure times are dependent on traffic volumes.
Facility: (I-895) Baltimore Harbor Tunnel
During tunnel closures at the (I-895) Baltimore Harbor Tunnel, drivers may experience 15-20 minute delays while two-way operations (during which one lane of southbound and northbound traffic is directed into the tunnel that remains open) are implemented. Closure times are dependent on traffic volumes.
FOR IMMEDIATE RELEASE
Aug. 11, 2016
RAMP FROM I-395 TO LEE STREET TEMPORARILY CLOSED FOR RACE EVENT
THIS SATURDAY
For Immediate Release
Facility: (I-895) Baltimore Harbor Tunnel
During tunnel closures at the (I-895) Baltimore Harbor Tunnel, drivers may experience 15-20 minute delays while two-way operations (during which one lane of southbound and northbound traffic is directed into the tunnel that remains open) are implemented. Closure times are dependent on traffic volumes.
FOR IMMEDIATE RELEASE
Aug. 1, 2016
24/7 RIGHT LANE CLOSURE ON SOUTHBOUND I-895
NEAR BALTIMORE/WASHINGTON PARKWAY
Follow #i895bmore and @TheMDTA on Twitter
Use I-95 as Alternate Route
For Immediate Release
Facility: (I-895) Baltimore Harbor Tunnel
During tunnel closures at the (I-895) Baltimore Harbor Tunnel, drivers may experience 15-20 minute delays while two-way operations (during which one lane of southbound and northbound traffic is directed into the tunnel that remains open) are implemented. Closure times are dependent on traffic volumes.
Facility: (I-895) Baltimore Harbor Tunnel
During tunnel closures at the (I-895) Baltimore Harbor Tunnel, drivers may experience 15-20 minute delays while two-way operations (during which one lane of southbound and northbound traffic is directed into the tunnel that remains open) are implemented. Closure times are dependent on traffic volumes.
Facility: (I-895) Baltimore Harbor Tunnel
During tunnel closures at the (I-895) Baltimore Harbor Tunnel, drivers may experience 15-20 minute delays while two-way operations (during which one lane of southbound and northbound traffic is directed into the tunnel that remains open) are implemented. Closure times are dependent on traffic volumes.
FOR IMMEDIATE RELEASE
July 11, 2016
OVERNIGHT LANE CLOSURES CONTINUE
ON I-895 AT K-TRUSS BRIDGE
Use I-95 As Alternate Route
WHAT: One lane on northbound or southbound I-895 at the K-Truss Bridge, south of the Baltimore Harbor Tunnel toll plaza, will be closed temporarily to traffic. Motorists should use I-95/Fort McHenry Tunnel as an alternate route.
10 AM
Baltimore City HQ building
707 N. Calvert Street
The SHA is hosting a career event for engineering positions throughout MDOT, including the MDTA, on October 16th from 10am to 3pm at its Baltimore City HQ building (707 N. Calvert Street).
Follow link to preregister.
9 AM
Livestream
This public meeting is livestreamed and archived on the MDTA Board Meeting Homepage. The MDTA Board Meeting homepage also provides access to the meeting schedule, materials, agenda and minutes.
9 AM
Livestream
This public meeting is livestreamed and archived on the Capital Committee Meeting Homepage. The Capital Committee Meeting homepage also provides access to the virtual meeting, schedule, agenda, materials and minutes.