Skip to main content
MDTA Home
Stay Informed

Sign up for updates and alerts from the Maryland Transportation Authority

STRONG WINDS EXPECTED FRIDAY INTO SATURDAY

Submitted by Tamory Winfield on

Be prepared for wind warnings, restrictions and the potential for temporary traffic holds at Maryland Transportation Authority (MDTA) bridges Friday and Saturday. Any decision to hold traffic at a toll facility would be based upon current weather at a given facility. The MDTA will make every effort to keep all of its facilities open as long as conditions are deemed safe to do so. High winds would prevent two-way operations (when one lane of eastbound traffic travels on the westbound span) at the Bay Bridge during Friday's afternoon rush-hour period.

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of Feb. 25 – March 3

Submitted by Tamory Winfield on

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of Feb. 25 - March 3

 

All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Lane closures are subject to change and closure times are dependent on traffic volumes.

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of Feb. 18 – 24

Submitted by Tamory Winfield on

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of Feb. 18 – 24

 

All work will be performed weather permitting.  The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals.  Lane closures are subject to change and closure times are dependent on traffic volumes. 

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of Feb. 11- 17

Submitted by Anonymous (not verified) on

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns

Scheduled for the Week of Feb. 11- 17

 

All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Lane closures are subject to change and closure times are dependent on traffic volumes.

TOLL DOLLARS AT WORK

REMINDER: Headlights are required at all times on the bridge.

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of Feb. 11- 17

Submitted by Anonymous (not verified) on

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns

Scheduled for the Week of Feb. 11- 17

 

All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Lane closures are subject to change and closure times are dependent on traffic volumes.

TOLL DOLLARS AT WORK

REMINDER: Headlights are required at all times on the bridge.

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of Feb. 4 – 10

Submitted by Tamory Winfield on

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of Feb. 4 – 10

All work will be performed weather permitting.  The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals.  Lane closures are subject to change and closure times are dependent on traffic volumes. 

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of Jan. 28 - Feb. 3

Submitted by Tamory Winfield on

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of Jan. 28 - Feb. 3

All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Lane closures are subject to change and closure times are dependent on traffic volumes.

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of Jan. 21 - 27

Submitted by Tamory Winfield on

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of Jan. 21 - 27

 

All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Lane closures are subject to change and closure times are dependent on traffic volumes.

Subscribe to

Keywords

Blog Calendar

Public Calendar

Dec 03

Capital Committee Meeting - December 3, 2024

9 AM

Livestream

This public meeting is livestreamed and archived on the Capital Committee Meeting Homepage. The Capital Committee Meeting homepage also provides access to the virtual meeting, schedule, agenda, materials and minutes.

Dec 04

CHESAPEAKE BAY CROSSING STUDY TIER 2 NEPA OPEN HOUSES

6 PM

Virtual Open House

Chesapeake Bay Crossing Study Tier 2 NEPA - Open Houses Dec.4, 9, and 11

On December 4, 9, and 11, 2024, the Maryland Transportation Authority (MDTA) will host Open Houses for the Chesapeake Bay Crossing Study: Tier 2 NEPA (Tier 2 Study). 

Virtual Open House
Wednesday, December 4, 2024
(6-8 p.m.)

Follow link to learn more: baycrossingstudy.com

Dec 05

Finance and Administration Committee Meeting - December 5, 2024

9 AM

Livestream

This public meeting is livestreamed and archived on the Finance and Administration Committee Meeting Homepage. The Finance and Administration Committee Meeting homepage also provides access to the virtual meeting, schedule, agenda, materials and minutes.

 
E-ZPass logo

E-ZPASS®

Save time with an E-ZPass.

Stop Fraud - Follow link.

Follow link to report fraud and/or abuse of State resources.