Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of April 8 – 14
Bay Bridge (US 50/301)
Lane Closures and Traffic Patterns
MDTA’S “OSPREY CAM” GOES LIVE TUESDAY, APRIL 3
FOR IMMEDIATE RELEASE
April 2, 2018
Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of April 1 – 7
Bay Bridge (US 50/301)
Lane Closures and Traffic Patterns
Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of March 25 – 31
Bay Bridge (US 50/301)
Lane Closures and Traffic Patterns
Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of March 11 – 17
Bay Bridge (US 50/301)
Lane Closures and Traffic Patterns
Scheduled for the Week of March 11 - 17
All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Lane closures are subject to change and closure times are dependent on traffic volumes.
EXPECT HIGH WINDS TO IMPACT MDTA BRIDGES INTO SUNDAY
EXPECT HIGH WINDS TO IMPACT MDTA BRIDGES INTO SUNDAY
Follow us on Twitter at Twitter.com/TheMDTA or
call 1-877-BAYSPAN (229-7726) for 24/7 conditions at the Bay Bridge
EXPECT HIGH WINDS TO IMPACT MDTA BRIDGES INTO SUNDAY
EXPECT HIGH WINDS TO IMPACT MDTA BRIDGES INTO SUNDAY
Follow us on Twitter at Twitter.com/TheMDTA or
call 1-877-BAYSPAN (229-7726) for 24/7 conditions at the Bay Bridge
Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of March 4 – 10
Bay Bridge (US 50/301)
Lane Closures and Traffic Patterns
Scheduled for the Week of March 4 - 10
All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Lane closures are subject to change and closure times are dependent on traffic volumes.