Skip to main content
MDTA Home
Stay Informed

Sign up for updates and alerts from the Maryland Transportation Authority

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of Dec. 1 – 7

Submitted by Tamory Winfield on

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of Dec. 1 – 7

 

 

All work will be performed weather permitting.  The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals.  Headlights are required at all times on the bridgeLane closures are subject to change and closure times are dependent on traffic volumes

 

TOLL DOLLARS AT WORK

 

Reminder:  The right lane on the westbound span is closed 24/7 for roadwork.  Expect major delays in both directions.

 

The westbound span may be closed Sunday from 10 p.m. to 5 a.m. the following morning, Monday through Thursday from 8 p.m. to 5 a.m. the following morning, Friday from 9 p.m. to 8 a.m. the following morning and Saturday from 8 p.m. to 8 a.m. the following morning for preservation/maintenance work or routine annual inspections.  Two-way traffic will operate on the eastbound span during the full westbound span closures.

FOR 24/7 BAY BRIDGE TRAFFIC INFORMATION CALL 1-877-BAYSPAN (1-877-229-7726) or visit Baybridge.com.

Know Before You Go - For real-time updates on major incidents follow us on Twitter at twitter.com/TheMDTA.  Sign up for email/text alerts at mdta.maryland.gov.  Find us at facebook.com/TheMDTA.  Call 511 or visit MD511.org for statewide travel information.

Blog Category

Blog Calendar

WAS THIS PAGE HELPFUL?

Public Calendar

Dec 03

Capital Committee Meeting - December 3, 2024

9 AM

Livestream

This public meeting is livestreamed and archived on the Capital Committee Meeting Homepage. The Capital Committee Meeting homepage also provides access to the virtual meeting, schedule, agenda, materials and minutes.

Dec 04

CHESAPEAKE BAY CROSSING STUDY TIER 2 NEPA OPEN HOUSES

6 PM

Virtual Open House

Chesapeake Bay Crossing Study Tier 2 NEPA - Open Houses Dec.4, 9, and 11

On December 4, 9, and 11, 2024, the Maryland Transportation Authority (MDTA) will host Open Houses for the Chesapeake Bay Crossing Study: Tier 2 NEPA (Tier 2 Study). 

Virtual Open House
Wednesday, December 4, 2024
(6-8 p.m.)

Follow link to learn more: baycrossingstudy.com

Dec 05

Finance and Administration Committee Meeting - December 5, 2024

9 AM

Livestream

This public meeting is livestreamed and archived on the Finance and Administration Committee Meeting Homepage. The Finance and Administration Committee Meeting homepage also provides access to the virtual meeting, schedule, agenda, materials and minutes.

 
E-ZPass logo

E-ZPASS®

Save time with an E-ZPass.

Stop Fraud - Follow link.

Follow link to report fraud and/or abuse of State resources.