MDTA Home
  • Now accepting proactive video tolling payments for trips made on or before June 30.
  • COVID-19 csc
  • ALL AET
  • I-95 Travel Plaza updates: Follow link to learn more
  • I-895 Bridge Project - Follow link to learn more.
  • Now accepting proactive video tolling payments for trips made on or before June 30.
  • ALL AET
  • COVID-19 CSC
  • Crossing the Bay Bridge Plan Ahead.
  • I-95 Travel Plaza updates: Follow link to learn more
  • I-895 Bridge Project - Follow link to learn more.

Stay Informed

Sign up for updates and alerts from the Maryland Transportation Authority

MDTA Traffic Advisories

The MDTA Traffic Advisories blog posts information about scheduled construction and maintenance projects or other traffic information that might interfere with the normal flow of traffic. Use the Keywords list to locate traffic advisories by facility.

Lane Shifts Begin at the Nice/Middleton Bridge During the Week of Oct. 5

FOR IMMEDIATE RELEASE                                  

Sept. 28, 2020

Lane Shifts Begin at the Nice/Middleton Bridge During the Week of Oct. 5

 

WHAT:          During the week of Oct. 5, 2020, the Maryland Transportation Authority (MDTA) will implement lane shifts on US 301 between the toll plaza and the existing Nice/Middleton bridge. Specifically, the northbound lane will shift onto the existing right shoulder and the southbound lane will shift onto the existing northbound lane, as depicted below. With no reduction in capacity, the shifts are anticipated to have minimal traffic impacts, though shoulders will be temporarily unavailable within this segment of US 301. 

              Existing Condition                                                                      New Condition

                    

These lane shifts are being implemented to provide construction crews with a safe and efficient work zone to construct the new approach to the future bridge. Temporary concrete barrier will be installed along the shoulder of southbound US 301 to protect work crews. 

WHEN:  Weather permitting, during the week of September 28, between the hours of 9 a.m. to 3 p.m., motorists are urged to slow down and exercise caution when approaching the location, as workers and vehicles will be present next to the highway preparing for the lane shifts that will begin the week of October 5. Motorists should expect alternating, 15-minute traffic holds.

Note: Additional traffic holds may be needed throughout the project for deliveries, movement of equipment and other maintenance requirements.

WHY:  Toll Dollars at Work: The work is part of the Maryland Transportation Authority’s (MDTA) project to build a new US 301 bridge to replace the 80-year-old Governor Harry W. Nice Memorial/Senator Thomas “Mac” Middleton Bridge over the Potomac River. The project is one of the State’s largest transportation initiatives and will improve mobility, safety and economic opportunities for southern Maryland, northeastern Virginia and the region. MDTA kicked off major construction in July, and the new, wider, four-lane crossing will open to traffic by early 2023. For details visit https://mdta.maryland.gov/NiceMiddletonBridge/Home.

Sign up for email/text alerts at https://bit.ly/2Dh9EZn or view real-time traffic camera images on MDTA roadways by visiting mdta.maryland.gov.  For real-time updates on major incidents follow us on Twitter at twitter.com/TheMDTA.  Find us on Facebook at facebook.com/TheMDTA. 

The MDTA thanks its customers for their patience and reminds them to Stay Alert So No One Gets Hurt!

 

###

Blog Category: 
S M T W T F S
 
 
 
 
1
 
2
 
3
 
4
 
5
 
6
 
7
 
8
 
9
 
10
 
11
 
12
 
13
 
14
 
15
 
16
 
17
 
18
 
19
 
20
 
21
 
22
 
23
 
24
 
25
 
26
 
27
 
28
 
29
 
30
 
31
 

Click to Translate:

Translation Disclaimer

Toll Rate Calculator

Toll Rate Calculator

Toll rates by vehicles, times, and facilities.

E-ZPass logo

E-ZPASS®

Save time with an E-ZPass.