Documents
The purpose of the Section 200 Project Planning Study is to address capacity and safety needs on I-95 from north of MD 43 to north of MD 22. The goal is to improve access, mobility and safety for local, regional and interstate traffic, including passenger, freight, and transit vehicles.
The study will evaluate improvements according to their ability to address the following capacity and safety needs for Section 200:
Finding of No Significant Impact [Complete PDF 17 MB]
- Cover [PDF 0.9 MB]
- Signature Page and Summary [PDF 0.43 MB]
- Table of Contents [PDF 0.14 MB]
- Chapter 1 - Introduction [PDF 0.4 MB]
- Chapter 2 - Summary of Actions and Recommendations [PDF 6.2 MB]
- Chapter 3 - Environmental Consequences of the Preferred Alternative [PDF 0.23 MB]
- Chapter 4 - Mitigation [PDF 9.5 MB]
- Chapter 5 - Status of Compliance with Regulatory Requirements [PDF 0.11 MB]
- Chapter 6 - Summary of Public Involvement [PDF 5.3 MB]
- Chapter 7 - Project Commitments [PDF 140 KB]
- Appendix A - Plates [PDF 5.2 MB]
- Appendix B - Relocation Assistance [PDF 73 KB]
- Appendix C - Correspondence [PDF 1.8 MB]
- Appendix D - Meeting Minutes & Property Ower Coordination [PDF 109 KB]
- Appendix E - Impact Matrix [PDF 3.4 MB]
- Appendix F - Public Hearing Transcript [PDF 3.4 MB]
- Appendix G - Summay Chart of Comments [PDF 2 MB]
- Appendix H - Public Comments [PDF 12 MB]
Environmental Assessment [Complete PDF 4.30MB]
- Summary [PDF 1.15 MB]
- Table of Contents [PDF 31 KB]
- Section I - Purpose and Need [PDF 1.81 MB]
- Section II - Alternatives Considered [PDF 1.78 MB]
- Section III - Existing Environmental Impact Analysis [PDF 1.07 MB]
- Section IV - Public Coordination Comments [PDF 57 KB]
Alternates Retained for Detailed Study (ARDS)[Complete PDF 24 MB]
- Table of Contents [PDF 518 KB]
- Chapter 1 - Pages 1-3 [PDF 248 KB]
- Chapter 2A - Pages 4-19 [PDF 8.5 MB]
- Chapter 2B - Pages 20-35 [PDF 4.3 MB]
- Chapter 2C - Pages 36-51 [PDF 9.6 MB]
- Chapter 3A - Pages 52-63 [PDF 6.5 MB]
- Chapter 3B - Pages 64-74 [PDF 5.7 MB]
- Chapter 3C - Pages 75-95 [PDF 7.8 MB]
- Chapter 3D - Pages 96-116 [PDF 5.9 MB]
- Chapter 3E - Pages 117-137 [PDF 5.5 MB]
PM2.5 Conformity Determination (Reevaluation) [PDF 530KB]