Bay Bridge (US 50/301)
Lane Closures and Traffic Patterns
Scheduled for the Week of Jan. 6 – 12
All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Lane closures are subject to change and closure times are dependent on traffic volumes.
TOLL DOLLARS AT WORK
REMINDER: Headlights are required at all times on the bridge.
The westbound span may be closed Sunday, Wednesday and Thursday from 8 p.m. to 5 a.m. the following morning, Friday from 9 p.m. to 8 a.m. the following morning and Saturday from 8 p.m. to 9 a.m. the following morning for preservation/maintenance work or routine annual inspections. Two-way traffic will operate on the eastbound span during the full westbound span closures.
The eastbound span may be closed Monday and Tuesday from 8 p.m. to 5 a.m. the following morning for preservation/maintenance work or routine annual inspections. Two-way traffic will operate on the westbound span during the full eastbound span closures.
One lane of the westbound span may be closed Monday and Tuesday from 9 a.m. to 2:30 p.m. and Friday from 9 a.m. to 12 noon for preservation/maintenance work.
One lane of the eastbound span may be closed Wednesday and Thursday from 9 a.m. to 2:30 p.m. for preservation/maintenance work. Two-way traffic will operate on the westbound span.
When daytime two-way traffic is in effect on the westbound span, toll lanes 1 through 5, on the left side of the toll plaza, will be directed into contra-flow traffic on the westbound span. Motorists wishing to use an E-ZPass® Only lane to access the eastbound span should use toll lanes 6 or 9.
Monday through Friday, one lane will be closed for approximately 15 minutes for contractor pick-up.
Know Before You Go - For real-time updates on major incidents follow us on Twitter at twitter.com/TheMDTA. Sign up for email/text alerts at mdta.maryland.gov. Find us at facebook.com/TheMDTA. Call 511 orvisit MD511.org for statewide travel information.