Skip to main content
Home

STAY INFORMED

Sign up for updates and alerts from the Maryland Transportation Authority.

 

Stay Informed

Sign up for updates and alerts from the Maryland Transportation Authority

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the week of March 16 – 22, 2025

Submitted by Tamory Winfield on

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the week of March 16 – 22, 2025

All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes and other work variables. 

TOLL DOLLARS AT WORK 

The eastbound span may be closed Sunday from 10 p.m. to 5 a.m. the following morning, Monday through Wednesday from 8 p.m. to 5 a.m. the following morning, Thursday from 9 p.m. to 5 a.m. the following morning, Friday from 10 p.m. to 7 a.m. the following morning and Saturday from 9 p.m. to 8 a.m. the following morning for preservation/maintenance work. The nighttime closures feature deck removal and replacement for the eastbound bridge deck replacement project. Temporary concrete connection slabs are utilized for this crucial work, allowing for travel lanes to reopen each morning and for a smoother driving transition across work areas. Learn more here. Two-way traffic will operate on the westbound span during the full eastbound span closures.

One lane of the westbound span may be closed Monday and Thursday from 9 a.m. to 2:30 p.m. and Friday from 9 a.m. to 12 p.m. for preservation/maintenance work. 

One lane of the eastbound span may be closed Tuesday and Wednesday from 9 a.m. to 2:30 p.m. for preservation/maintenance work. Two-way traffic will operate on the westbound span.

Note: Lane closures may start earlier if traffic volumes allow. Motorists advised to call 1-877-BAYSPAN (229-7726) for 24/7 bridge conditions.


Tolling Reminder:  All-electronic tolling is statewide in Maryland. Standard Video Toll rates apply for any trips not paid with a valid E-ZPass or Pay-By-Plate account at toll facilities. Enroll in E-ZPass or Pay-By-Plate at DriveEzMD.com.

For 24/7 real time Bay Bridge updates call 1-877-BAYSPAN (1-877-229-7726) or visit Baybridge.com. You may also follow us on X/Twitter at https://x.com/TheMDTA where major incidents are covered.

Blog Category

Blog Calendar

WAS THIS PAGE HELPFUL?

Public Calendar

Oct 17

North Point Flea Plaza Market

7:00 AM

North Point Plaza
2401 North Point Blvd., Dundalk, MD 21222

The DriveEzMD Outreach Team will be at the North Point Flea Market with games, promotional items, and answers to your E-ZPass account questions!

Oct 17

Truck or Treat – Meet Maryland’s Highway Heroes Event

10:00 AM

SHA Hanover
7491 Connely Drive, Building #1
Hanover, Maryland 21076

Come out for Trunk or Treat and Touch a Truck, where you can enjoy some Halloween fun, check out some awesome vehicles, and meet Maryland’s highway heroes! Bring the family, grab some treats, and make sure to stop by the DriveEzMD booth while you’re there!

Oct 18

North Point Flea Plaza Market

7:30 AM

2401 North Point Blvd
Dundalk, MD  21222

The DriveEzMD Outreach Team will be at the North Point Flea Market with games, promotional items, and answers to your E-ZPass account questions!