Skip to main content
Home

STAY INFORMED

Sign up for updates and alerts from the Maryland Transportation Authority.

 

Stay Informed

Sign up for updates and alerts from the Maryland Transportation Authority

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of October 13 – 19, 2024

Submitted by Tamory Winfield on

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of October 13 – 19, 2024

All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes and other work variables. 

TOLL DOLLARS AT WORK 

The westbound span may be closed Sunday from 11 p.m. to 5 a.m. the following morning for preservation/maintenance work. Two-way traffic will operate on the eastbound span during the full westbound span closure.

The eastbound span may be closed Tuesday and Wednesday from 8 p.m. to 5 a.m. the following morning, Thursday from 9 p.m. to 5 a.m. the following morning, Friday from 11 p.m. to 7 a.m. the following morning and Saturday from 9 p.m. to 8 a.m. the following morning for preservation/maintenance work. The nighttime closures feature deck removal and replacement for the eastbound bridge deck replacement project. Temporary concrete connection slabs are utilized for this crucial work, allowing for travel lanes to reopen each morning and for a smoother driving transition across work areas. Learn more here. Two-way traffic will operate on the westbound span during the full eastbound span closures.

One lane of the westbound span may be closed Tuesday through Thursday from 9 a.m. to 2:30 p.m. and Friday from 9 a.m. to 12 p.m. for preservation/maintenance work.

Note: Lane closures may start earlier if traffic volumes allow. Motorists advised to call 1-877-BAYSPAN (229-7726) for 24/7 bridge conditions.

Travel off-peak when crossing from shore to shore. The best times to cross the Bay Bridge on weekends include:

  • Friday – eastbound before 10 a.m. & after 9 p.m. and westbound before 10 a.m. & after 8 p.m.
  • Saturday – eastbound before 7 a.m. & after 6 p.m. and westbound before 9 a.m. & after 7 p.m.
  • Sunday – eastbound before 10 a.m. & after 7 p.m. and westbound before 11 a.m. & after 10 p.m.

Tolling Reminder:  All-electronic tolling is statewide in Maryland. Standard Video Toll rates apply for any trips not paid with a valid E-ZPass or Pay-By-Plate account at toll facilities. Enroll in E-ZPass or Pay-By-Plate at DriveEzMD.com.

For 24/7 real time Bay Bridge updates call 1-877-BAYSPAN (1-877-229-7726) or visit Baybridge.com. You may also follow us on X/Twitter at https://x.com/TheMDTA where major incidents are covered.

Blog Category

Blog Calendar

Public Calendar

Oct 30

Billy Strings at CFG Bank Arena

6:30 PM

CFG Bank Arena
201 W Baltimore St.
Baltimore, MD 21201

Come say hi! Stop by the DriveEzMD Outreach table before or after the event to grab some fun giveaways, chat with our team, and learn how E-ZPass can help make your travels around Maryland easier and more convenient.

Nov 05

Capital Committee Meeting

9:00 AM

Livestream

This public meeting is livestreamed and archived on the Capital Committee Meeting Homepage. The Capital Committee Meeting homepage also provides access to the virtual meeting, schedule, agenda, materials and minutes.

Nov 07

Anne Arundel Historical Society Early Christmas Vendor Fair

8:00 AM

Benson-Hammond House
7101 Aviation Blvd,
Linthicum Heights, MD 21090

Stop by and visit DriveEzMD at the Early Christmas Fall Flea Market and Craft Fair! Connect with our outreach team to learn more about E-ZPass Maryland, explore the benefits of having an account, and get answers to your tolling questions. Enjoy a day of local vendors, handmade crafts, and seasonal shopping while discovering how DriveEzMD can make your travels easier.