Bay Bridge (US 50/301)
Lane Closures and Traffic Patterns
Scheduled for the Week of April 5 – 11
All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes.
TOLL DOLLARS AT WORK
The eastbound span may be closed Sunday from 7 p.m. to 5 a.m. the following morning for preservation/maintenance work. Two-way traffic will operate on the westbound span during the full eastbound span closure.
The westbound span may be closed Monday and Tuesday from 7 p.m. to 5 a.m. the following morning for preservation/maintenance work. Two-way traffic will operate on the eastbound span during the full westbound span closures.
One lane of the eastbound span and two lanes of the westbound span may be closed Wednesday and Thursday from 7 p.m. to 5 a.m. the following morning for preservation/maintenance work.
One lane of the westbound span may be closed Monday through Thursday from 9 a.m. to 5 p.m. for preservation/maintenance work..
Note: The 24/7 right lane closure on the westbound span is no longer in effect. Toll lanes 3, 4 & 5 closed for construction.
FOR 24/7 BAY BRIDGE TRAFFIC INFORMATION CALL 1-877-BAYSPAN (1-877-229-7726) or visit Baybridge.com.
Know Before You Go - For real-time updates on major incidents follow us on Twitter at twitter.com/TheMDTA. Sign up for email/text alerts at mdta.maryland.gov. Find us at facebook.com/TheMDTA. Call 511 or visit MD511.org for statewide travel information.