Skip to main content
MDTA Home
Stay Informed

Sign up for updates and alerts from the Maryland Transportation Authority

#895BMORE BRIDGE TRAFFIC PATTERN CHANGE

Submitted by Tamory Winfield on

FOR IMMEDIATE RELEASE                              

December 4, 2020

 

#895BMORE BRIDGE TRAFFIC PATTERN CHANGE

Four Lanes (Two in Each Direction) Open North of Tunnel

Holabird Avenue Ramp Reopens; One Lane in Each Direction Through Tunnel

Continue to Avoid I-895 and Use I-695/Key Bridge or I-95/Fort McHenry Tunnel

 

WHAT:         Four lanes of traffic – two lanes in each direction – will be open on I-895 north of the Baltimore Harbor Tunnel on the recently constructed bridge. In addition, the Holabird Avenue exit ramp has also reopened. One lane of traffic in each direction will continue through the Baltimore Harbor Tunnel up to the toll plaza structure until early 2021 while crews complete project work.

WHEN:         Weather permitting, Friday, December 4, crews will have restored four lanes of traffic on I-895 north of the Baltimore Harbor Tunnel.

Note: Motorists should anticipate the return of regular off-peak Baltimore Harbor Tunnel tube closures for routine maintenance operations in 2021.

WHY:            Toll Dollars At Work: The traffic pattern changes are part of the Maryland Transportation Authority’s (MDTA) three-year, $189 million I-895 Bridge Project to replace the 60-year-old bridges and Holabird Avenue exit ramp north of the Harbor Tunnel, and rehabilitate the Harbor Tunnel. The project began in April 2018 and is expected to be completed in summer 2021. For more details on the project, visit 895bmore.com. 

TOLLING REMINDER: All-electronic tolling is permanent statewide. Effective January 1, 2021, standard Video Toll rates will apply for any trips not paid with a valid E-ZPass at toll facilities statewide. Pay the lowest tolls with E-ZPass Maryland. Sign-up is available 24/7 at ezpassmd.com.

Sign up for email/text alerts here https://bit.ly/2Dh9EZn or view real-time traffic camera images on MDTA roadways by visiting mdta.maryland.gov.  For real-time updates on major incidents follow us on Twitter at twitter.com/TheMDTA.  Find us on Facebook at facebook.com/TheMDTA

 

The MDTA thanks its customers for their patience and reminds them to Stay Alert So No One Gets Hurt!

Blog Category

Blog Calendar

WAS THIS PAGE HELPFUL?

Public Calendar

Dec 03

Capital Committee Meeting - December 3, 2024

9 AM

Livestream

This public meeting is livestreamed and archived on the Capital Committee Meeting Homepage. The Capital Committee Meeting homepage also provides access to the virtual meeting, schedule, agenda, materials and minutes.

Dec 04

CHESAPEAKE BAY CROSSING STUDY TIER 2 NEPA OPEN HOUSES

6 PM

Virtual Open House

Chesapeake Bay Crossing Study Tier 2 NEPA - Open Houses Dec.4, 9, and 11

On December 4, 9, and 11, 2024, the Maryland Transportation Authority (MDTA) will host Open Houses for the Chesapeake Bay Crossing Study: Tier 2 NEPA (Tier 2 Study). 

Virtual Open House
Wednesday, December 4, 2024
(6-8 p.m.)

Follow link to learn more: baycrossingstudy.com

Dec 05

Finance and Administration Committee Meeting - December 5, 2024

9 AM

Livestream

This public meeting is livestreamed and archived on the Finance and Administration Committee Meeting Homepage. The Finance and Administration Committee Meeting homepage also provides access to the virtual meeting, schedule, agenda, materials and minutes.

 
E-ZPass logo

E-ZPASS®

Save time with an E-ZPass.

Stop Fraud - Follow link.

Follow link to report fraud and/or abuse of State resources.