Skip to main content
Home

STAY INFORMED

Sign up for updates and alerts from the Maryland Transportation Authority.

 

Stay Informed

Sign up for updates and alerts from the Maryland Transportation Authority

Progress Continues as Test Pile Program Set to Begin for Key Bridge Rebuild

Submitted by Tamory Winfield on

 

Progress Continues as Test Pile Program Set to Begin for 

Key Bridge Rebuild 

 

BALTIMORE (September 24, 2025) — The Maryland Transportation Authority (MDTA) today announced the Test Pile Program for the rebuilding of the Francis Scott Key Bridge is expected to begin on or about September 27, weather permitting. Six test piles have arrived in Baltimore via barge. The test piles were fabricated with American-made steel, are eight feet in diameter and more than 220 feet in length. 

“The Test Pile Program marks another major milestone in the Key Bridge Rebuild project,” said MDTA Executive Director Bruce Gartner. “Some of the test piles will be evaluated for the potential to be incorporated into the permanent foundations for the new bridge.” 

Test Pile Program Sequence

  1. The piles will be lifted into position using a crane and tripping barge.

  2. The piles will be placed in a template and stabilized with a vibratory hammer.

  3. The piles will be driven into the riverbed with a hydraulic hammer.

  4. The load frame will be placed on the six piles and exert vertical and horizontal pressure. 

  5. The equipment and piles are equipped with instruments which will report out data to ensure the design models are accurate.

What Nearby Communities Should Expect During the Test Pile Program

Over the course of 6-8 weeks, twelve test piles will be driven into the riverbed. Two piles will be driven per week, each pile is expected to be hammered for approximately two hours, sounding similar to a large bell in the distance. Construction activity will typically occur Monday through Saturday during daylight hours within a 12-hour window. 

Noise and vibration monitors were installed around the project area and surrounding communities which have been collecting baseline data prior to the start of demolition, the test pile program and construction. The monitors will provide the team with real-time data which will be compared against the baseline data to ensure pre-construction and construction activities stay within acceptable limits.

This video, featuring MDTA Chief Engineer Jim Harkness, provides more information on the test pile activities and their role in rebuilding the Key Bridge. Click here to watch the video. The MDTA is serious about safety, transparency and public communication throughout the Key Bridge Rebuild. 

As a reminder, boaters should review the Smooth Waters Initiative information online to help protect other boaters, marine workers, and construction personnel during the rebuilding of the Key Bridge on the Patapsco River. 

For the latest project information and to receive project updates through email alerts: 

 

###

Blog Category

Blog Calendar

WAS THIS PAGE HELPFUL?

Public Calendar

Oct 09

Finance and Administration Committee Meeting - October 9, 2025

9 AM

Livestream

This public meeting is livestreamed and archived on the Finance and Administration Committee Meeting Homepage. The Finance and Administration Committee Meeting homepage also provides access to the virtual meeting, schedule, agenda, materials and minutes.

Oct 20

Bay Bridge Protection Project Industry Forum

10 AM

Harry Hughes Conference Room
MDOT Headquarters
7201 Corporate Center Drive
Hanover, MD 21076

 

Marine Contractors, Engineers, and MBE Firms! Are you interested in working on the Bay Bridge Protection Project?

Join us for the MDTA Industry Forum on Monday, October 20, 2025 from 10:00 AM to 12:00 PM. 

Bay Bridge Protection Project Industry Forum - October 2025

Oct 30

MDTA Board Meeting - October 30, 2025

9 AM

Livestream

This public meeting is livestreamed and archived on the MDTA Board Meeting Homepage. The MDTA Board Meeting homepage also provides access to the meeting schedule, materials, agenda and minutes.