Skip to main content
Home

STAY INFORMED

Sign up for updates and alerts from the Maryland Transportation Authority.

 

Stay Informed

Sign up for updates and alerts from the Maryland Transportation Authority

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of March 24 – 30

Submitted by Tamory Winfield on

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of March 24 – 30

                                                                                                                 

All work will be performed weather permitting.  The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals.  Lane closures are subject to change and closure times are dependent on traffic volumes

 

TOLL DOLLARS AT WORK

 

REMINDER: Headlights are required at all times on the bridge.

 

The westbound span may be closed Sunday from 10 p.m. to 5 a.m. the following morning, Monday through Wednesday from 8 p.m. to 5 a.m. the following morning, Thursday from 9 p.m. to 5 a.m. the following morning, Friday from 10 p.m. to 7 a.m. the following morning and Saturday from 9 p.m. to   8 a.m. the following morning for preservation/maintenance work or routine annual inspections.  Two-way traffic will operate on the eastbound span during the full westbound span closures.

One lane of the eastbound span may be closed Monday and Tuesday from 9 a.m. to 2:30 p.m. and Friday from 9 a.m. to 12 noon for preservation/maintenance work. Two-way traffic will operate on the westbound span.

One lane of the westbound span may be closed Wednesday and Thursday from 9 a.m. to 2:30 p.m. for preservation/maintenance work.

When daytime two-way traffic is in effect on the westbound span, toll lanes 1 through 5, on the left side of the toll plaza, will be directed into contra-flow traffic on the westbound span.  Motorists wishing to use anE-ZPass® Only lane to access the eastbound span should use toll lanes 6 or 9.

Monday through Friday, one lane will be closed for approximately 15 minutes for contractor pick-up.

FOR 24/7 BAY BRIDGE TRAFFIC INFORMATION CALL 1-877-BAYSPAN (1-877-229-7726) or visit Baybridge.com.

Know Before You Go - For real-time updates on major incidents follow us on Twitter at twitter.com/TheMDTA.  Sign up for email/text alerts at mdta.maryland.gov.  Find us at facebook.com/TheMDTA.  Call 511 orvisit MD511.org for statewide travel information.

Blog Category

Blog Calendar

WAS THIS PAGE HELPFUL?

Public Calendar

Sep 13

DriveEzMD Team - ABC Cookout

10 AM

Quad at Cross Keys
2 Hamill Rd., Baltimore, MD 21210

The DriveEzMD Outreach team will be at Cross Keys for the ABC Cookout with transponders and information on how to cruise through Maryland Tolls with ease!

10:00am – 4:30pm

Sep 13

DriveEzMD Team - Essex Day Festival

10 AM

400-600 Eastern Blvd.
Baltimore, Maryland, 21221

The DriveEzMD Outreach team will be at the Essex Day Festival with transponders and information on how to cruise through Maryland Tolls with ease!

10:00am – 6:00pm 

Sep 14

DriveEzMD Team - Ravens Walk

11 AM

M&T Bank Stadium
1101 Russell Street, Baltimore, MD 21230

Join our team at the Ravens Walk at M&T Bank Stadium! Stop by to get all your questions answered and learn how DriveEzMD can help you save time and money on Maryland Tolls!

11:00am – 2:00pm