Skip to main content
MDTA Home

Stay Informed

Sign up for updates and alerts from the Maryland Transportation Authority

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of November 10 – 16, 2024

Submitted by Tamory Winfield on

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of November 10 – 16, 2024

All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes and other work variables

TOLL DOLLARS AT WORK 

Note: The eastbound span will be closed to traffic Sunday, November 10, from approximately 12:01 a.m. to 2 p.m., for the Bay Bridge Run. Two-way traffic will operate on the westbound span. The center lane may open to traffic intermittently to help reduce westbound delays. Learn more here.

The eastbound span may be closed Tuesday and Wednesday from 8 p.m. to 5 a.m. the following morning, Thursday from 9 p.m. to 5 a.m. the following morning, Friday from 10 p.m. to 7 a.m. the following morning and Saturday from 8 p.m. to 8 a.m. the following morning for preservation/maintenance work. The nighttime closures feature deck removal and replacement for the eastbound bridge deck replacement project. Temporary concrete connection slabs are utilized for this crucial work, allowing for travel lanes to reopen each morning and for a smoother driving transition across work areas. Learn more here. Two-way traffic will operate on the westbound span during the full eastbound span closures.

One lane of the eastbound span may be closed Tuesday through Thursday from 9 a.m. to 2:30 p.m. and Friday from 9 a.m. to 12 p.m. Two-way traffic will operate on the westbound span.

There are no scheduled lane closures on November 11.

Note: Lane closures may start earlier if traffic volumes allow. Motorists advised to call 1-877-BAYSPAN (229-7726) for 24/7 bridge conditions.


Tolling Reminder:  All-electronic tolling is statewide in Maryland. Standard Video Toll rates apply for any trips not paid with a valid E-ZPass or Pay-By-Plate account at toll facilities. Enroll in E-ZPass or Pay-By-Plate at DriveEzMD.com.

For 24/7 real time Bay Bridge updates call 1-877-BAYSPAN (1-877-229-7726) or visit Baybridge.com. You may also follow us on X/Twitter at https://x.com/TheMDTA where major incidents are covered.

Blog Category

Blog Calendar

WAS THIS PAGE HELPFUL?

Public Calendar

Dec 21

DriveEzMD Team - Raven’s Walk VS Steelers

1 PM

1101 Russell St
Baltimore, MD 21230

Our DriveEzMD Team is in your community! Come talk with us about everything tolling – E-ZPass, Pay-By-Plate & Video Tolling. Pick up an E-ZPass On the Go and save up to 77% on your toll trips.

Jan 02

Capital Committee Meeting - January 2, 2025

9 AM

Livestream

This public meeting is livestreamed and archived on the Capital Committee Meeting Homepage. The Capital Committee Meeting homepage also provides access to the virtual meeting, schedule, agenda, materials and minutes.

Jan 09

Finance and Administration Committee Meeting - January 9, 2025

9 AM

Livestream

This public meeting is livestreamed and archived on the Finance and Administration Committee Meeting Homepage. The Finance and Administration Committee Meeting homepage also provides access to the virtual meeting, schedule, agenda, materials and minutes.

 
E-ZPass logo

E-ZPASS®

Save time with an E-ZPass.

Stop Fraud - Follow link.

Follow link to report fraud and/or abuse of State resources.