Skip to main content
Home

STAY INFORMED

Sign up for updates and alerts from the Maryland Transportation Authority.

 

Stay Informed

Sign up for updates and alerts from the Maryland Transportation Authority

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of March 28 – April 3, 2021

Submitted by Tamory Winfield on

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of March 28 – April 3, 2021

 

All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes

TOLL DOLLARS AT WORK 

The eastbound span may be closed Sunday from 10 p.m. to 5 a.m. the following morning for preservation/maintenance work. Two-way traffic will operate on the westbound span during the full eastbound span closure.

The westbound span may be closed Monday through Wednesday from 8 p.m. to 5 a.m. the following morning and Thursday from 9 p.m. to 5 a.m. the following morning for preservation/maintenance work. Two-way traffic will operate on the eastbound span during the full westbound span closures.

Overnight work on the westbound span includes deck/joint repairs and replacements that will result in steel plates placed in the center and left lanes. Work and required use of steel plates is expected to wrap up by the end of May.

Note: Overnight closures may start earlier if traffic volumes allow. Motorists advised to call 1-877-BAYSPAN (229-7726) for 24/7 bridge conditions.

One lane of the westbound span may be closed Monday through Thursday from 9 a.m. to 2:30 p.m. for preservation/maintenance work.

Tolling Reminder:  All-electronic tolling is permanent statewide. Standard Video Toll rates apply for any trips not paid with a valid E-ZPass at toll facilities statewide. Pay the lowest tolls with E-ZPass Maryland. Sign-up is available 24/7 at ezpassmd.com.

FOR 24/7 BAY BRIDGE TRAFFIC INFORMATION CALL 1-877-BAYSPAN (1-877-229-7726) or visit Baybridge.com.

Know Before You Go - For real-time updates on major incidents follow us on Twitter at twitter.com/TheMDTA.  Sign up for email/text alerts at https://bit.ly/2Dh9EZn.  Find us at facebook.com/TheMDTA.  Call 511 or visit MD511.org for statewide travel information.

All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge.

Blog Category

Blog Calendar

WAS THIS PAGE HELPFUL?

Public Calendar

Nov 03

Ravens Purple Evening

4 PM

M&T Bank Stadium
1101 Russell Street, Baltimore, MD 21230

DriveEzMD Outreach will be at Ravens Purple Evening, a special night just for the ladies at the stadium! Stop by our table to chat with our outreach volunteers and get your E-ZPass questions answered while celebrating your Ravens pride.

Nov 04

Glow Run at Norwood Elementary School

5 PM

Norwood Elementary School
1700 Delvale Ave, Dundalk, MD 21222

DriveEzMD Outreach will be at The Glow Run, a fun-filled, family-friendly event focused on health, fitness, and community! Stop by our booth before or after the 1-mile Glow Run to get information about E-ZPass, ask questions, and learn how we’re helping Marylanders stay on the move.

5:00pm – 7:00pm

Nov 06

Capital Committee Meeting - November 6, 2025

9 AM

Livestream

This public meeting is livestreamed and archived on the Capital Committee Meeting Homepage. The Capital Committee Meeting homepage also provides access to the virtual meeting, schedule, agenda, materials and minutes.