Skip to main content
MDTA Home
Toys for Tots December 2021 - Follow link to learn more.
MDTA at 50 - Follow link to explore our history.
Over the bridge through the tunnel Everywhere you want to go
baybridge.maryland.gov
Traveled a Maryland Toll Road Since July 2020?
Toys for Tots December 2021 Follow link to learn more
MDTA at 50 - Follow link to explore our history
Over the bridge through the tunnel Everywhere you want to go
baybridge.maryland.gov
Traveled a Maryland Toll Road Since July 2020?

Stay Informed

Sign up for updates and alerts from the Maryland Transportation Authority

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of Oct. 4 – 10

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of Oct. 4 – 10

All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes

TOLL DOLLARS AT WORK 

The eastbound span may be closed Sunday from 10 p.m. to 5 a.m. the following morning for preservation/maintenance work. Two-way traffic will operate on the westbound span during the full eastbound span closure.

The westbound span may be closed Monday and Thursday from 8 p.m. to 5 a.m. the following morning and Saturday from 9 p.m. to 7 a.m. the following morning for preservation/maintenance work. Two-way traffic will operate on the eastbound span during the full westbound span closures.

Note: Overnight closures may start earlier if traffic volumes allow. Motorists advised to call 1-877-BAYSPAN (229-7726) for 24/7 bridge conditions.

Overnight/off-peak work on the westbound span will include deck/joint repairs and replacements that will result in periods of steel plates placed in the center and left lanes.

One lane of the eastbound span may be closed Monday through Thursday from 9 a.m. to 2:30 p.m. and Friday from

9 a.m. to 12 p.m. for preservation/maintenance work. Two-way traffic will operate on the westbound span.

Note:  Full-time all-electronic (cashless) tolling in effect. Tolls collected via gantry on Kent Island side. Three lanes merge down to two on eastbound US 50 at Oceanic Drive (Exit 32). Left lane will open to traffic when two-way is in effect on westbound bridge. Motorists should obey all signs and speed limits, as the approach to the bridge is an active work zone.  

FOR 24/7 BAY BRIDGE TRAFFIC INFORMATION CALL 1-877-BAYSPAN (1-877-229-7726) or visit Baybridge.com.

Know Before You Go - For real-time updates on major incidents follow us on Twitter at twitter.com/TheMDTA.  Sign up for email/text alerts at https://bit.ly/2Dh9EZn.  Find us at facebook.com/TheMDTA.  Call 511 or visit MD511.org for statewide travel information.

Blog Category

Blog Calendar

WAS THIS PAGE HELPFUL?