Skip to main content
Home

STAY INFORMED

Sign up for updates and alerts from the Maryland Transportation Authority.

 

Stay Informed

Sign up for updates and alerts from the Maryland Transportation Authority

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of June 10 – 16

Submitted by Tamory Winfield on

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of June 10 – 16

                                                                                              

All work will be performed weather permitting.  The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals.  Lane closures are subject to change and closure times are dependent on traffic volumes

 

TOLL DOLLARS AT WORK

 

REMINDER: Headlights are required at all times on the bridge.

 

The eastbound span may be closed Sunday from midnight to 5 a.m. the following morning for preservation/maintenance work or routine annual inspections.  Two-way traffic will operate on the westbound span during the full eastbound span closure.

 

The westbound span may be closed Monday through Wednesday from 10 p.m. to 5 a.m. the following morning, Thursday from 11 p.m. to 5 a.m. the following morning and Saturday from 11 p.m. to 7 a.m. the following morning for preservation/maintenance work or routine annual inspections.  Two-way traffic will operate on the eastbound span during the full westbound span closures.

 

One lane of the westbound span may be closed Monday through Wednesday from 9 a.m. to 2:30 p.m. and Thursday from 9 a.m. to 1 p.m. for preservation/maintenance work.

 

Monday through Thursday, one lane will be closed for approximately 15 minutes for contractor pick-up.

Travel off-peak when heading to and from the Eastern Shore.  The best times to travel the Bay Bridge this weekend include:

  • Friday – before 10 a.m. and after 10 p.m.
  • Saturday – before 7 a.m. and after 5 p.m.
  • Sunday – before 10 a.m. and after 10 p.m.           

FOR 24/7 BAY BRIDGE TRAFFIC INFORMATION CALL 1-877-BAYSPAN (1-877-229-7726) or visit Baybridge.com.

Know Before You Go - For real-time updates on major incidents follow us on Twitter at twitter.com/TheMDTA.  Sign up for email/text alerts atmdta.maryland.gov.  Find us at facebook.com/TheMDTA.  Call 511 orvisit MD511.org for statewide travel information.

Blog Category

Blog Calendar

WAS THIS PAGE HELPFUL?

Public Calendar

Oct 20

Bay Bridge Protection Project Industry Forum

10 AM

Harry Hughes Conference Room
MDOT Headquarters
7201 Corporate Center Drive
Hanover, MD 21076

 

Marine Contractors, Engineers, and MBE Firms! Are you interested in working on the Bay Bridge Protection Project?

Join us for the MDTA Industry Forum on Monday, October 20, 2025 from 10:00 AM to 12:00 PM. 

Bay Bridge Protection Project Industry Forum - October 2025

Oct 30

MDTA Board Meeting - October 30, 2025

9 AM

Livestream

This public meeting is livestreamed and archived on the MDTA Board Meeting Homepage. The MDTA Board Meeting homepage also provides access to the meeting schedule, materials, agenda and minutes.