Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of Feb. 11- 17
Bay Bridge (US 50/301) Lane Closures and Traffic Patterns
Scheduled for the Week of Feb. 11- 17
All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Lane closures are subject to change and closure times are dependent on traffic volumes.
TOLL DOLLARS AT WORK
REMINDER: Headlights are required at all times on the bridge.