Skip to main content
Home

STAY INFORMED

Sign up for updates and alerts from the Maryland Transportation Authority.

 

Stay Informed

Sign up for updates and alerts from the Maryland Transportation Authority

STRONG WINDS EXPECTED FRIDAY INTO SATURDAY

Submitted by Tamory Winfield on

Be prepared for wind warnings, restrictions and the potential for temporary traffic holds at Maryland Transportation Authority (MDTA) bridges Friday and Saturday. Any decision to hold traffic at a toll facility would be based upon current weather at a given facility. The MDTA will make every effort to keep all of its facilities open as long as conditions are deemed safe to do so. High winds would prevent two-way operations (when one lane of eastbound traffic travels on the westbound span) at the Bay Bridge during Friday's afternoon rush-hour period.

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of Feb. 25 – March 3

Submitted by Tamory Winfield on

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of Feb. 25 - March 3

 

All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Lane closures are subject to change and closure times are dependent on traffic volumes.

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of Feb. 18 – 24

Submitted by Tamory Winfield on

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of Feb. 18 – 24

 

All work will be performed weather permitting.  The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals.  Lane closures are subject to change and closure times are dependent on traffic volumes. 

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of Feb. 11- 17

Submitted by Anonymous (not verified) on

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns

Scheduled for the Week of Feb. 11- 17

 

All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Lane closures are subject to change and closure times are dependent on traffic volumes.

TOLL DOLLARS AT WORK

REMINDER: Headlights are required at all times on the bridge.

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of Feb. 11- 17

Submitted by Anonymous (not verified) on

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns

Scheduled for the Week of Feb. 11- 17

 

All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Lane closures are subject to change and closure times are dependent on traffic volumes.

TOLL DOLLARS AT WORK

REMINDER: Headlights are required at all times on the bridge.

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of Feb. 4 – 10

Submitted by Tamory Winfield on

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of Feb. 4 – 10

All work will be performed weather permitting.  The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals.  Lane closures are subject to change and closure times are dependent on traffic volumes. 

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of Jan. 28 - Feb. 3

Submitted by Tamory Winfield on

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of Jan. 28 - Feb. 3

All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Lane closures are subject to change and closure times are dependent on traffic volumes.

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of Jan. 21 - 27

Submitted by Tamory Winfield on

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of Jan. 21 - 27

 

All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Lane closures are subject to change and closure times are dependent on traffic volumes.

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of Jan. 7 – 13

Submitted by Tamory Winfield on

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of Jan. 7 - 13

 

All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Lane closures are subject to change and closure times are dependent on traffic volumes.

Subscribe to Subscribe to

Keywords

Blog Calendar

Public Calendar

Oct 10

Parkville Carney Festival

10:00 AM

St. Ursula Church
8801 Harford Rd, Parkville, MD 21234

Join us at the Parkville Carney Festival to explore local vendors, enjoy live entertainment, and chat with the DriveEzMD team about how E-ZPass can save you time and money.

Oct 10

Community Resource Tailgate at Chesapeake High School

11:00 AM

Chesapeake High School – STEM Academy
1801 Turkey Point Rd, Essex, MD 21221

Kick off a great day at Chesapeake High School! Join us for the Community Tailgate Resource Tables, where you can connect with local organizations, discover helpful resources, enjoy fun activities, and win prizes. Don’t forget to stop by the E-ZPass booth and say hello!
 

Oct 11

15th Annual Pikesville Fall Festival

10:00 AM

Quarry Lake
2510 Quarry Lake Dr, Baltimore, MD 21209

Celebrate the 15th Annual Fall Festival with a day full of local vendors, activities, and community fun. While you’re exploring, be sure to stop by the DriveEzMD booth for fun giveaways, tolling information, and help with all your E-ZPass questions!