Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of July 12 – 18
Bay Bridge (US 50/301)
Lane Closures and Traffic Patterns
Bay Bridge (US 50/301)
Lane Closures and Traffic Patterns
Bay Bridge (US 50/301)
Lane Closures and Traffic Patterns
Traveling the Bay Bridge During 4th of July Weekend?
Bay Bridge (US 50/301)
Lane Closures and Traffic Patterns
Bay Bridge (US 50/301)
Lane Closures and Traffic Patterns
Bay Bridge (US 50/301)
Lane Closures and Traffic Patterns
Bay Bridge (US 50/301)
Lane Closures and Traffic Patterns
Bay Bridge (US 50/301)
Lane Closures and Traffic Patterns
Bay Bridge (US 50/301)
Lane Closures and Traffic Patterns
NEW Bay Bridge traffic pattern for eastbound motorists with the full-time all-electronic (cashless) tolling system. Three lanes merge down to two at Oceanic Drive (Exit 32). Left lane will open to traffic when two-way (contraflow) is in effect on the westbound bridge (See image below).
9 AM
Livestream
This public meeting is livestreamed and archived on the Capital Committee Meeting Homepage. The Capital Committee Meeting homepage also provides access to the virtual meeting, schedule, agenda, materials and minutes.
9 AM
Livestream
This public meeting is livestreamed and archived on the Finance and Administration Committee Meeting Homepage. The Finance and Administration Committee Meeting homepage also provides access to the virtual meeting, schedule, agenda, materials and minutes.
5 PM
Dundalk Heritage Park, 2717 Playfield Street, Dundalk, MD 21222
Our DriveEzMD Team is in your community! Come talk with us about everything tolling – E-ZPass, Pay-By-Plate & Video Tolling. Pick up an E-ZPass On the Go and save up to 77% on your toll trips.
5:30pm-7:30pm