Bay Bridge (US 50/301)
Lane Closures and Traffic Patterns
Scheduled for the Week of Oct. 25 - 31, 2015
All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Lane closures are subject to change and closure times are dependent on traffic volumes.
TOLL DOLLARS AT WORK
REMINDER: Headlights are required at all times on the bridge.
The westbound span may be closed Sunday from 11 p.m. to 5 a.m. the following morning, Monday through Wednesday from 8 p.m. to 5 a.m. the following morning, Thursday from 9 p.m. to 5 a.m. the following morning, Friday from 11 p.m. to 7 a.m. the following morning and Saturday from 9 p.m. to 8 a.m. the following morning for preservation/maintenance work or routine annual inspections. Two-way traffic will operate on the eastbound span during the full westbound span closures.
One lane of the westbound span may be closed Monday through Thursday from 9 a.m. to 2:30 p.m. and Friday from 9 a.m. to noon for preservation/maintenance work.
Monday through Friday, one lane will be closed for approximately 15 minutes for contractor pick-up.
FOR 24/7 BAY BRIDGE TRAFFIC INFORMATION CALL 1-877-BAYSPAN (1-877-229-7726) or visit baybridge.com
Know Before You Go - For real-time updates on major incidents follow us on Twitter at twitter.com/TheMDTA. Find us at facebook.com/TheMDTA and mdta.maryland.gov. Call 511 or visit MD511.org for statewide travel information.
###