Skip to main content
Home

STAY INFORMED

Sign up for updates and alerts from the Maryland Transportation Authority.

 

Stay Informed

Sign up for updates and alerts from the Maryland Transportation Authority

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of Oct. 11 - 17, 2015

Submitted by Tamory Winfield on

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of Oct. 11 - 17, 2015

 

All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Lane closures are subject to change and closure times are dependent on traffic volumes.

TOLL DOLLARS AT WORK

REMINDER: Headlights are required at all times on the bridge.

The westbound span may be closed Sunday from 11 p.m. to 5 a.m. the following morning and Tuesday and Wednesday from 9 p.m. to 5 a.m. the following morning for preservation/maintenance work or routine annual inspections. Two-way traffic will operate on the eastbound span during the full westbound span closures.

The eastbound span may be closed Thursday from 10 p.m. to 5 a.m. the following morning and Saturday from 10 p.m. to 7 a.m. the following morningfor preservation/maintenance work or routine annual inspections.  Two-way traffic will operate on the westbound span during the full eastbound span closure.

One lane of the westbound span may be closed Tuesday and Thursday from 9 a.m. to 2:30 p.m. and Friday from 9 a.m. to noon for preservation/maintenance work.

One lane of the eastbound span may be closed Wednesday from 9 a.m. to 2:30 p.m. for preservation/maintenance work. Two-way traffic will operate on the westbound span.

When daytime two-way traffic is in effect on the westbound span, toll lanes 1 through 5, on the left side of the toll plaza, will be directed into contra-flow traffic on the westbound span. Motorists wishing to use an E-ZPass® Only lane to access the eastbound span should use toll lanes 6 or 9.

Tuesday through Friday, one lane will be closed for approximately 15 minutes for contractor pick-up.

FOR 24/7 BAY BRIDGE TRAFFIC INFORMATION CALL 1-877-BAYSPAN (1-877-229-7726) or visit baybridge.com

Know Before You Go - For real-time updates on major incidents follow us on Twitter at twitter.com/TheMDTA. Find us at facebook.com/TheMDTA and mdta.maryland.gov. Call 511 or visit MD511.org for statewide travel information.

###

Keywords

Blog Calendar

WAS THIS PAGE HELPFUL?

Public Calendar

May 30

North Point Flea Market

7:00 AM

2401 North Point Blvd., Dundalk, MD  21222

The DriveEzMD Outreach Team will be at the North Point Flea Market with games, promotional items, and answers to your E-ZPass account questions!

May 30

Hot Wheels Monster Trucks Live Glow-N-Fire

7:00 PM

CFG Bank Arena
201 W Baltimore St, Baltimore, MD 21201

Heading to a show at CFG Bank Arena? Stop by the DriveEzMD Outreach table to pick up fun giveaways and discover how E-ZPass can make your next journey as smooth as possible!

May 31

Crusher Run 5k

8:00 AM

Martin Marietta - Texas Quarry
430 W. Padonia Rd., Timonium, MD 21093

Gear up for the Crusher Run 5K in Timonium! DriveEzMD will be there cheering you on.Stop by our table before or after the race for games, giveaways, and help with your E-ZPass account. We’ll also have transponders available for purchase so you can keep moving with ease on and off the course!