Skip to main content
MDTA Home
Stay Informed

Sign up for updates and alerts from the Maryland Transportation Authority

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of March 19 – 25, 2023

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of March 19 – 25, 2023

All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes

TOLL DOLLARS AT WORK 

TEMPORARY TRAFFIC HOLDS AT KEY & BAY BRIDGES FOR LARGE CRANE MOVEMENT BY SHIP FROM PORT OF BALTIMORE  ANTICIPATED THURSDAY, MARCH 16

FOR IMMEDIATE RELEASE

March 14, 2023

 

March 15 UPDATE: Date has changed to Saturday, March 18, at same times listed below.

TEMPORARY TRAFFIC HOLDS AT KEY & BAY BRIDGES FOR

LARGE CRANE MOVEMENT BY SHIP FROM PORT OF BALTIMORE

 ANTICIPATED THURSDAY, MARCH 16

Traffic Holds for Motorist Safety

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of March 12 – 18, 2023

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of March 12 – 18, 2023

 

All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of March 5 – 11, 2023

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of March 5 – 11, 2023

All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of February 26 – March 4, 2023

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of February 26 – March 4, 2023

All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes

TOLL DOLLARS AT WORK 

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of February 19 – 25, 2023

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of February 19 – 25, 2023

All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes

TOLL DOLLARS AT WORK 

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of February 12 – 18, 2023

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of February 12 – 18, 2023

 

All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of February 5 – 11, 2023

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of February 5 – 11, 2023

All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes

TOLL DOLLARS AT WORK 

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of January 29 – February 4, 2023

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of January 29 – February 4, 2023

 

All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of January 22 – 28, 2023

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of January 22 – 28, 2023

All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes

TOLL DOLLARS AT WORK 

Keywords

Blog Calendar

WAS THIS PAGE HELPFUL?

Public Calendar

Jun 28

MDTA Board Meeting - June 28, 2024

1 PM

Livestream

This public meeting is livestreamed and archived on the MDTA Board Meeting Homepage. The MDTA Board Meeting homepage also provides access to the meeting schedule, materials, agenda and minutes.

Jun 28

DriveEzMD Team - Dundalk Heritage Fair

4 PM

Dundalk Heritage Park, 2717 Playfield Street, Dundalk, MD 21222

Our DriveEzMD Team is in your community! Come talk with us about everything tolling – E-ZPass, Pay-By-Plate & Video Tolling. Pick up an E-ZPass On the Go and save up to 77% on your toll trips.

Jun 29

Dundalk Heritage Fair

12 PM

Dundalk Heritage Park, 2717 Playfield Street, Dundalk, MD 21222

Our DriveEzMD Team is in your community! Come talk with us about everything tolling – E-ZPass, Pay-By-Plate & Video Tolling. Pick up an E-ZPass On the Go and save up to 77% on your toll trips.

12pm to 10pm