Skip to main content
Home

STAY INFORMED

Sign up for updates and alerts from the Maryland Transportation Authority.

 

Stay Informed

Sign up for updates and alerts from the Maryland Transportation Authority

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the week of December 21, 2025 – January 3, 2026

Submitted by Tamory Winfield on

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the week of December 21, 2025 – January 3, 2026

All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes and other work variables. 

TOLL DOLLARS AT WORK 

The westbound span may be closed Sunday, December 21, from 10 p.m. to 5 a.m. the following morning and Monday, December 22, and Tuesday, December 23, from 8 p.m. to 5 a.m. the following morning for preservation/maintenance work. Two-way traffic will operate on the eastbound span during the full westbound span closures.

One lane of the eastbound span may be closed Monday, December 22, and Tuesday, December 23, from 9 a.m. to 2:30 p.m. for preservation/maintenance work. Two-way traffic will operate on the westbound span.

There are no scheduled lane closures between December 24 – 26 and December 31 – January 1.

The westbound span may be closed Saturday, December 27, from 8 p.m. to 8 a.m. the following morning, Sunday, December 28, from 10 p.m. to 5 a.m. the following morning, Monday, December 29, and Tuesday, December 30, from 

8 p.m. to 5 a.m. the following morning, Friday, January 2, from 9 p.m. to 8 a.m. the following morning and Saturday, January 3, from 8 p.m. to 9 a.m. the following morning for preservation/maintenance work. Two-way traffic will operate on the eastbound span during the full westbound span closures.

One lane of the eastbound span may be closed Monday, December 29, and Tuesday, December 30, from 9 a.m. to 2:30 p.m. and Friday, January 2, from 9 a.m. to 12 p.m. for preservation/maintenance work. Two-way traffic will operate on the westbound span.


Tolling Reminder:  All-electronic tolling is statewide in Maryland. Standard Video Toll rates apply for any trips not paid with a valid E-ZPass or Pay-By-Plate account at toll facilities. Enroll in E-ZPass or Pay-By-Plate at DriveEzMD.com. 

1-877-BAYSPAN (1-877-229-7726) for 24/7 real-time Bay Bridge traffic conditions. For real-time updates on major incidents follow us on X at x.com/TheMDTA. 

Keywords

Blog Calendar

Public Calendar

Oct 30

Billy Strings at CFG Bank Arena

6:30 PM

CFG Bank Arena
201 W Baltimore St.
Baltimore, MD 21201

Come say hi! Stop by the DriveEzMD Outreach table before or after the event to grab some fun giveaways, chat with our team, and learn how E-ZPass can help make your travels around Maryland easier and more convenient.

Nov 05

Capital Committee Meeting

9:00 AM

Livestream

This public meeting is livestreamed and archived on the Capital Committee Meeting Homepage. The Capital Committee Meeting homepage also provides access to the virtual meeting, schedule, agenda, materials and minutes.

Nov 07

Anne Arundel Historical Society Early Christmas Vendor Fair

8:00 AM

Benson-Hammond House
7101 Aviation Blvd,
Linthicum Heights, MD 21090

Stop by and visit DriveEzMD at the Early Christmas Fall Flea Market and Craft Fair! Connect with our outreach team to learn more about E-ZPass Maryland, explore the benefits of having an account, and get answers to your tolling questions. Enjoy a day of local vendors, handmade crafts, and seasonal shopping while discovering how DriveEzMD can make your travels easier.