Skip to main content
MDTA Home
Stay Informed

Sign up for updates and alerts from the Maryland Transportation Authority

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of Feb. 14 - 20, 2016

Submitted by Tamory Winfield on

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of Feb. 14 - 20, 2016

All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Lane closures are subject to change and closure times are dependent on traffic volumes.

TOLL DOLLARS AT WORK

REMINDER: Headlights are required at all times on the bridge.

The westbound span may be closed Sunday through Thursday from 8 p.m. to 5 a.m. the following morning, Friday from 9 p.m. to 8 a.m. the following morning and Saturday from 8 p.m. to 9 a.m. the following morning for preservation/maintenance work or routine annual inspections. Two-way traffic will operate on the eastbound span during the full westbound span closures.

One lane of the eastbound span may be closed Monday through Thursday from 9 a.m. to 2:30 p.m. and Friday from 9 a.m. to noon for preservation/maintenance work. Two-way traffic will operate on the westbound span.

When daytime two-way traffic is in effect on the westbound span, toll lanes 1 through 5, on the left side of the toll plaza, will be directed into contra-flow traffic on the westbound span. Motorists wishing to use an E-ZPass® Only lane to access the eastbound span should use toll lanes 6 or 9.

Monday through Friday, one lane will be closed for approximately 15 minutes for contractor pick-up.

FOR 24/7 BAY BRIDGE TRAFFIC INFORMATION CALL 1-877-BAYSPAN (1-877-229-7726) or visit baybridge.com

Know Before You Go - For real-time updates on major incidents follow us on Twitter at twitter.com/TheMDTA. Find us at facebook.com/TheMDTA and mdta.maryland.gov. Call 511 or visit MD511.org for statewide travel information.

###

Keywords

Blog Calendar

WAS THIS PAGE HELPFUL?

Public Calendar

Dec 03

Capital Committee Meeting - December 3, 2024

9 AM

Livestream

This public meeting is livestreamed and archived on the Capital Committee Meeting Homepage. The Capital Committee Meeting homepage also provides access to the virtual meeting, schedule, agenda, materials and minutes.

Dec 04

CHESAPEAKE BAY CROSSING STUDY TIER 2 NEPA OPEN HOUSES

6 PM

Virtual Open House

Chesapeake Bay Crossing Study Tier 2 NEPA - Open Houses Dec.4, 9, and 11

On December 4, 9, and 11, 2024, the Maryland Transportation Authority (MDTA) will host Open Houses for the Chesapeake Bay Crossing Study: Tier 2 NEPA (Tier 2 Study). 

Virtual Open House
Wednesday, December 4, 2024
(6-8 p.m.)

Follow link to learn more: baycrossingstudy.com

Dec 05

Finance and Administration Committee Meeting - December 5, 2024

9 AM

Livestream

This public meeting is livestreamed and archived on the Finance and Administration Committee Meeting Homepage. The Finance and Administration Committee Meeting homepage also provides access to the virtual meeting, schedule, agenda, materials and minutes.

 
E-ZPass logo

E-ZPASS®

Save time with an E-ZPass.

Stop Fraud - Follow link.

Follow link to report fraud and/or abuse of State resources.