ALLEVIATE TRAVEL DELAYS THIS FOURTH OF JULY HOLIDAY WITH OPTIMAL BAY BRIDGE DRIVE TIMES
ALLEVIATE TRAVEL DELAYS THIS FOURTH OF JULY HOLIDAY WITH OPTIMAL BAY BRIDGE DRIVE TIMES
Call 1-877-BAYSPAN (229-7726) for 24/7 Bridge Conditions
Call 1-877-BAYSPAN (229-7726) for 24/7 Bridge Conditions
Bay Bridge (US 50/301)
Lane Closures and Traffic Patterns
All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes and other work variables.
All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes and other work variables.
All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes and other work variables.
All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes and other work variables.
All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes and other work variables.
WHAT YOU NEED TO KNOW TRAVELING MARYLAND TOLL ROADS THIS MEMORIAL DAY WEEKEND
Prioritizing Safety, Helps You Arrive Safely
All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes and other work variables.
All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes and other work variables.
9 AM
Livestream
This public meeting is livestreamed and archived on the Capital Committee Meeting Homepage. The Capital Committee Meeting homepage also provides access to the virtual meeting, schedule, agenda, materials and minutes.
6 PM
Virtual Open House
On December 4, 9, and 11, 2024, the Maryland Transportation Authority (MDTA) will host Open Houses for the Chesapeake Bay Crossing Study: Tier 2 NEPA (Tier 2 Study).
Virtual Open House
Wednesday, December 4, 2024
(6-8 p.m.)
Follow link to learn more: baycrossingstudy.com
9 AM
Livestream
This public meeting is livestreamed and archived on the Finance and Administration Committee Meeting Homepage. The Finance and Administration Committee Meeting homepage also provides access to the virtual meeting, schedule, agenda, materials and minutes.