Skip to main content
Home

STAY INFORMED

Sign up for updates and alerts from the Maryland Transportation Authority.

 

Stay Informed

Sign up for updates and alerts from the Maryland Transportation Authority

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the week of October 12 – 18, 2025

Submitted by Tamory Winfield on

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the week of October 12 – 18, 2025

All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes and other work variables

TOLL DOLLARS AT WORK 

The westbound span may be closed Sunday from 11 p.m. to 5 a.m. the following morning for preservation/maintenance work. Two-way traffic will operate on the eastbound span during the full westbound span closure.

The eastbound span may be closed Tuesday and Wednesday from 8 p.m. to 5 a.m. the following morning, Thursday from  9 p.m. to 5 a.m. the following morning, Friday from 11 p.m. to 7 a.m. the following morning and Saturday from 9 p.m. to 8 a.m. the following morning for preservation/maintenance work. The nighttime closures for the eastbound bridge deck replacement project. Learn more here. Two-way traffic will operate on the westbound span during the full eastbound span closures.

One lane of the eastbound span may be closed Tuesday through Thursday from 9 a.m. to 2:30 p.m. and Friday from 9 a.m. to 12 p.m. for preservation/maintenance work. Two-way traffic will operate on the westbound span.

Travel off-peak when crossing from shore to shore. The best times to cross the Bay Bridge on weekends include: 

  • Friday – eastbound before 9 a.m. & after 8 p.m. and westbound before 9 a.m. & after 7 p.m.

  • Saturday – eastbound before 7 a.m. & after 7 p.m. and westbound before 9 a.m. & after 7 p.m.

  • Sunday – eastbound before 10 a.m. & after 7 p.m. and westbound before 11 a.m. & after 10 p.m.


Tolling Reminder:  All-electronic tolling is statewide in Maryland. Standard Video Toll rates apply for any trips not paid with a valid E-ZPass or Pay-By-Plate account at toll facilities. Enroll in E-ZPass or Pay-By-Plate at DriveEzMD.com

1-877-BAYSPAN (1-877-229-7726) for 24/7 real-time Bay Bridge traffic conditions. For real-time updates on major incidents follow us on X at x.com/TheMDTA

Keywords

Blog Calendar

WAS THIS PAGE HELPFUL?

Public Calendar

Oct 09

Finance and Administration Committee Meeting - October 9, 2025

9 AM

Livestream

This public meeting is livestreamed and archived on the Finance and Administration Committee Meeting Homepage. The Finance and Administration Committee Meeting homepage also provides access to the virtual meeting, schedule, agenda, materials and minutes.

Oct 20

Bay Bridge Protection Project Industry Forum

10 AM

Harry Hughes Conference Room
MDOT Headquarters
7201 Corporate Center Drive
Hanover, MD 21076

 

Marine Contractors, Engineers, and MBE Firms! Are you interested in working on the Bay Bridge Protection Project?

Join us for the MDTA Industry Forum on Monday, October 20, 2025 from 10:00 AM to 12:00 PM. 

Bay Bridge Protection Project Industry Forum - October 2025

Oct 30

MDTA Board Meeting - October 30, 2025

9 AM

Livestream

This public meeting is livestreamed and archived on the MDTA Board Meeting Homepage. The MDTA Board Meeting homepage also provides access to the meeting schedule, materials, agenda and minutes.