Skip to main content
MDTA Home

Stay Informed

Sign up for updates and alerts from the Maryland Transportation Authority

I-95 ETL Northbound Extension - Southbound I-95 Noise Wall from MD24 to north of Woodsdale Road

As part of the MDTA’s $1.1 billion program to relieve congestion and improve travel along the I-95 corridor into Harford County, the MDTA is reconstructing northbound (NB) I-95 from MD 43 to north of MD 24. The future roadway configuration will consist of four general purpose, non-tolled lanes to MD 24 and two ETL. North of MD 24 the future roadway configuration will consist of three general purpose lanes and the ETL will merge into NB I-95 ending north of the Abingdon Overpass. As part of the Program, a new noise wall will be constructed along southbound I-95 from MD 24 to north of Woodsdale Road. The noise wall will provide noise level reduction for the Waldon Apartments. The location of the new noise wall will vary to optimize its effectiveness. Portions of the noise wall will be located along the existing southbound shoulder and portions will transition back to the right-of-way line. The noise wall will enhance the quality of life for the residents in this community by reducing the noise levels from the highway. The new noise wall will not eliminate the noise level but will reduce the noise level to be within the acceptable ranges as defined by state and federal guidelines.

The new noise walls will:

  • Include a stone pattern finish
  • Vary in height from approximately 12 feet to 32 feet

Noise Wall Map

Noise Wall Map

Noise Wall Example

About Construction

Construction of the noise wall will be completed via access from I-95 with off-peak traffic lane and shoulder closures. The noise wall is anticipated to begin construction in Summer 2023 and be complete in the fall of 2024.

WAS THIS PAGE HELPFUL?

Public Calendar

Dec 21

DriveEzMD Team - Raven’s Walk VS Steelers

1 PM

1101 Russell St
Baltimore, MD 21230

Our DriveEzMD Team is in your community! Come talk with us about everything tolling – E-ZPass, Pay-By-Plate & Video Tolling. Pick up an E-ZPass On the Go and save up to 77% on your toll trips.

Jan 02

Capital Committee Meeting - January 2, 2025

9 AM

Livestream

This public meeting is livestreamed and archived on the Capital Committee Meeting Homepage. The Capital Committee Meeting homepage also provides access to the virtual meeting, schedule, agenda, materials and minutes.

Jan 09

Finance and Administration Committee Meeting - January 9, 2025

9 AM

Livestream

This public meeting is livestreamed and archived on the Finance and Administration Committee Meeting Homepage. The Finance and Administration Committee Meeting homepage also provides access to the virtual meeting, schedule, agenda, materials and minutes.

 
E-ZPass logo

E-ZPASS®

Save time with an E-ZPass.

Stop Fraud - Follow link.

Follow link to report fraud and/or abuse of State resources.