Skip to main content
MDTA Home

Stay Informed

Sign up for updates and alerts from the Maryland Transportation Authority

Resiliency 

Waterways:

Where possible, MDTA has installed clear span bridges over waterways and 100-year floodplains. The replacement bridge over the Big Gunpowder River is a clear span bridge. The existing piers within the waterway are being removed as part of the bridge replacement project so that the flow of the Big Gunpowder River is unobstructed. 

Flood Attenuation:

MDTA constructed a flood attenuation facility at Old Joppa Road. The intent of creating this facility is to reduce downstream discharges on an unnamed tributary to the Little Gunpowder Falls, thereby reducing the 100-year water surface elevations for privately owned and improved properties downstream of I-95 along this tributary. 

Underground stormwater management retention facility prior to being covered.

Underground stormwater management retention facility prior to being covered.

Oversized Culverts:

Throughout Harford County, culverts were sized to accommodate discharges associated with the ultimate build-out condition of the surrounding land uses. While this approach entails over-design and more up-front expenditures, it provides assurance to the local government that planned developments in the vicinity of the I-95 corridor will not have to incur additional costs associated with providing quantity control of stormwater runoff.

WAS THIS PAGE HELPFUL?

Public Calendar

Dec 21

DriveEzMD Team - Raven’s Walk VS Steelers

1 PM

1101 Russell St
Baltimore, MD 21230

Our DriveEzMD Team is in your community! Come talk with us about everything tolling – E-ZPass, Pay-By-Plate & Video Tolling. Pick up an E-ZPass On the Go and save up to 77% on your toll trips.

Jan 02

Capital Committee Meeting - January 2, 2025

9 AM

Livestream

This public meeting is livestreamed and archived on the Capital Committee Meeting Homepage. The Capital Committee Meeting homepage also provides access to the virtual meeting, schedule, agenda, materials and minutes.

Jan 09

Finance and Administration Committee Meeting - January 9, 2025

9 AM

Livestream

This public meeting is livestreamed and archived on the Finance and Administration Committee Meeting Homepage. The Finance and Administration Committee Meeting homepage also provides access to the virtual meeting, schedule, agenda, materials and minutes.

 
E-ZPass logo

E-ZPASS®

Save time with an E-ZPass.

Stop Fraud - Follow link.

Follow link to report fraud and/or abuse of State resources.