Bay Bridge (US 50/301)
Lane Closures and Traffic Patterns
Scheduled for the Week of May 3 – 9
All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes.
TOLL DOLLARS AT WORK
The westbound span may be closed Monday through Thursday from 7 p.m. to 5 a.m. the following morning and Friday and Saturday from 7 p.m. to 7 a.m. the following morning for preservation/maintenance work. Two-way traffic will operate on the eastbound span during the full westbound span closures.
One lane of the eastbound span may be closed Monday through Friday from 7 a.m. to 3 p.m. for preservation/maintenance work.
Note: As part of the work to bring all-electronic tolling and highway-speed traffic lanes through the existing tolling structure by summer, starting May 2, E-ZPass Only Toll Lanes 1 and 2 will close for construction. Toll lanes 3, 4 and 5 have been closed since January 2020. Motorists should stay right and obey all signs and speed limits, as the plaza is an active work zone. E-ZPass accepted in all open toll lanes.
FOR 24/7 BAY BRIDGE TRAFFIC INFORMATION CALL 1-877-BAYSPAN (1-877-229-7726) or visit Baybridge.com.
Know Before You Go - For real-time updates on major incidents follow us on Twitter at twitter.com/TheMDTA. Sign up for email/text alerts at mdta.maryland.gov. Find us at facebook.com/TheMDTA. Call 511 or visit MD511.org for statewide travel information.