Bay Bridge (US 50/301)
Lane Closures and Traffic Patterns
Scheduled for December 22 – 30, 2024
All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes and other work variables.
TOLL DOLLARS AT WORK
The eastbound span may be closed Sunday, December 22, from 10 p.m. to 5 a.m. the following morning, Monday, December 23, from 8 p.m. to 5 a.m. the following morning, Friday, December 27, from 9 p.m. to 8 a.m. the following morning, Saturday, December 28, from 8 p.m. to 8 a.m. the following morning, Sunday, December 29, from 10 p.m. to 5 a.m. the following morning and Monday, December 30, from 8 p.m. to 5 a.m. the following morning for preservation/maintenance work. The nighttime closures feature deck removal and replacement for the eastbound bridge deck replacement project. Temporary concrete connection slabs are utilized for this crucial work, allowing for travel lanes to reopen each morning and for a smoother driving transition across work areas. Learn more here. Two-way traffic will operate on the westbound span during the full eastbound span closures.
There are no scheduled lane closures between December 24 – 26 and December 31 – January 1.
Note: Lane closures may start earlier if traffic volumes allow. Motorists advised to call 1-877-BAYSPAN (229-7726) for 24/7 bridge conditions.
Tolling Reminder: All-electronic tolling is statewide in Maryland. Standard Video Toll rates apply for any trips not paid with a valid E-ZPass or Pay-By-Plate account at toll facilities. Enroll in E-ZPass or Pay-By-Plate at DriveEzMD.com.
For 24/7 real time Bay Bridge updates call 1-877-BAYSPAN (1-877-229-7726) or visit Baybridge.com. You may also follow us on X/Twitter at https://x.com/TheMDTA where major incidents are covered.