Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for December 22 – 30, 2024
Bay Bridge (US 50/301)
Lane Closures and Traffic Patterns
Scheduled for December 22 – 30, 2024
Bay Bridge (US 50/301)
Lane Closures and Traffic Patterns
Scheduled for December 22 – 30, 2024
Bay Bridge (US 50/301)
Lane Closures and Traffic Patterns
Scheduled for the Week of December 15 – 21, 2024
Bay Bridge (US 50/301)
Lane Closures and Traffic Patterns
Scheduled for the Week of December 8 – 14, 2024
Bay Bridge (US 50/301)
Lane Closures and Traffic Patterns
Scheduled for the Week of December 2 – 7, 2024
Bay Bridge (US 50/301)
Lane Closures and Traffic Patterns
Scheduled for the Week of November 24 – 26, 2024
All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes and other work variables.
Two-Way Traffic Operations on Westbound Span; Motorists Should Anticipate Significant Delays;
Call 1-877-BAYSPAN (229-7726) for Traffic Information
(November 4, 2024) – The Maryland Transportation Authority (MDTA) is partnering with Anne Arundel and Queen Anne’s counties to accommodate the Bay Bridge Run on Sunday, November 10. The run will be held on the eastbound span of the bridge.
All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes and other work variables.
All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes and other work variables.
All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes and other work variables.
1 PM
1101 Russell St
Baltimore, MD 21230
Our DriveEzMD Team is in your community! Come talk with us about everything tolling – E-ZPass, Pay-By-Plate & Video Tolling. Pick up an E-ZPass On the Go and save up to 77% on your toll trips.
9 AM
Livestream
This public meeting is livestreamed and archived on the Capital Committee Meeting Homepage. The Capital Committee Meeting homepage also provides access to the virtual meeting, schedule, agenda, materials and minutes.
9 AM
Livestream
This public meeting is livestreamed and archived on the Finance and Administration Committee Meeting Homepage. The Finance and Administration Committee Meeting homepage also provides access to the virtual meeting, schedule, agenda, materials and minutes.