Skip to main content
MDTA Home
Key Bridge News

Stay Informed

Sign up for updates and alerts from the Maryland Transportation Authority

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of June 9 – 15

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of June 9 – 15

                                                                                                                             

All work will be performed weather permitting.  The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals.  Lane closures are subject to change and closure times are dependent on traffic volumes

 

TOLL DOLLARS AT WORK

 

REMINDER: Headlights are required at all times on the bridge.

 

The eastbound span may be closed Sunday from midnight to 5 a.m. the following morning for preservation/maintenance work or routine annual inspections.  Two-way traffic will operate on the westbound span during the full eastbound span closure.

 

The westbound span may be closed Monday through Wednesday from 10 p.m. to 5 a.m. the following morning, Thursday from 11 p.m. to 5 a.m. the following morning and Saturday from 11 p.m. to 7 a.m. the following morning for preservation/maintenance work or routine annual inspections.  Two-way traffic will operate on the eastbound span during the full westbound span closures.

 

One lane of the westbound span may be closed Monday and Tuesday from 9 a.m. to 2:30 p.m. for preservation/maintenance work.

 

One lane of the eastbound span may be closed Wednesday from 9 a.m. to 2:30 p.m. and Thursday from 9 a.m. to 1 p.m.  Two-way traffic will operate on the westbound span.

 

When daytime two-way traffic is in effect on the westbound span, toll lanes 1 through 5, on the left side of the toll plaza, will be directed into contra-flow traffic on the westbound span.  Motorists wishing to use an

E-ZPass®Only lane to access the eastbound span should use toll lanes 6 or 9.

Monday through Thursday, one lane will be closed for approximately 15 minutes for contractor pick-up.

Travel off-peak when heading to and from the Eastern Shore.  The best times to travel the Bay Bridge on weekends include:

  • Friday – before 10 a.m. and after 10 p.m.
  • Saturday – before 7 a.m. and after 5 p.m.
  • Sunday – before 10 a.m. and after 10 p.m.

FOR 24/7 BAY BRIDGE TRAFFIC INFORMATION CALL 1-877-BAYSPAN (1-877-229-7726) or visit Baybridge.com.

Know Before You Go - For real-time updates on major incidents follow us on Twitter at twitter.com/TheMDTA.  Sign up for email/text alerts at mdta.maryland.gov.  Find us at facebook.com/TheMDTA.  Call 511 orvisit MD511.org for statewide travel information.

Blog Category

Blog Calendar

WAS THIS PAGE HELPFUL?

Public Calendar

Apr 04

Capital Committee Meeting - April 4, 2024

9 AM

Livestream

This public meeting is livestreamed and archived on the Capital Committee Meeting Homepage. The Capital Committee Meeting homepage also provides access to the virtual meeting, schedule, agenda, materials and minutes.

Apr 11

Finance Committee Meeting - April 11, 2024

9 AM

Livestream

This public meeting is livestreamed and archived on the Finance Committee Meeting Homepage. The Finance Committee Meeting homepage also provides access to the virtual meeting, schedule, agenda, materials and minutes.

Apr 25

MDTA Board Meeting - April 25, 2024

8 AM

Livestream Event

This public meeting is livestreamed and archived on the MDTA Board Meeting Homepage. The MDTA Board Meeting homepage also provides access to the meeting schedule, materials, agenda and minutes.