Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of Jan. 4, 2015-Jan. 10, 2015 All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Lane closures are subject to change and closure times are dependent on traffic volumes. REMINDER: Headlights are required at all times on the bridge. The eastbound span may be closed Monday through Thursday from 8 p.m. to 5 a.m. the following morning, Friday from 9 p.m. to 8 a.m. the following morning and Saturday from 8 p.m. to 9 a.m. the following morning for preservation/maintenance work or routine annual inspections. Two-way traffic will operate on the westbound span during the full eastbound span closures. One lane of the eastbound span may be closed Monday through Friday from 9 a.m. to 2:30 p.m. for preservation/maintenance work. Two-way traffic will operate on the westbound span. Monday through Friday, one lane will be closed for approximately 15 minutes for contractor pick-up. Note: Concrete repair and replacement project underway at Bay Bridge toll plaza. Lanes 6-8 and associated toll booths will reopen by 5 a.m. Monday morning and lanes 4-6 will close continuously (24/7) for approximately eight weeks. Pay attention to overhead and portable electronic signs. Know Before You Go - For real-time updates on major incidents follow us on Twitter at twitter.com/TheMDTA. Find us at facebook.com/TheMDTA and mdta.maryland.gov. Call 511 or visit MD511.org for statewide travel information. ###TOLL DOLLARS AT WORK
Blog Category